{"id":77995,"date":"2024-10-17T18:09:58","date_gmt":"2024-10-17T18:09:58","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/usgbc-leedfornewconstructionv2-2referenceguide-2007-2006\/"},"modified":"2024-10-24T19:35:25","modified_gmt":"2024-10-24T19:35:25","slug":"usgbc-leedfornewconstructionv2-2referenceguide-2007-2006","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/usgbc\/usgbc-leedfornewconstructionv2-2referenceguide-2007-2006\/","title":{"rendered":"USGBC LEEDforNewConstructionv2 2ReferenceGuide 2007 2006"},"content":{"rendered":"
The LEED for New Construction Rating System is designed to guide and distinguish high-performance commercial and institutional projects, including office buildings, high-rise residential buildings, government buildings, recreational facilities, manufacturing plants and laboratories.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
11<\/td>\n | Foreword from the U.S. Green Building Council <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Introduction Why Make Your Building Green? LEED Green Building Rating System <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | LEED for New Construction Overview and Process <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | LEED for New Construction Version 2.2 Reference Guide <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Sustainable Sites <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | SS Prerequisite 1: Construction Activity Pollution Prevention <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | SS Credit 1 Site Selection <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | SS Credit 2 Development Density & Community Connectivity <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | SS Credit 3 Brownfield Redevelopment <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | SS Credit 4.1 Alternative Transportation: Public Transportation Access <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | SS Credit 4.2 Alternative Transportation: Bicycle Storage & Changing Rooms <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | SS Credit 4.3 Alternative Transportation: Low Emitting & Fuel Efficient Vehicles <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | SS Credit 4.4 Alternative Transportation: Parking Capacity <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | SS Credit 5.1 Site Development: Protect or Restore Habitat <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | SS Credit 5.2 Site Development: Maximize Open Space <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | SS Credit 6.1 Stormwater Design: Huantity Control <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | SS Credit 6.2 Stormwater Design: Huality Control <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | SS Credit 7.1 Heat Island Effect: NonyRoof <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | SS Credit 7.2 Heat Island Effect: Roof <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | SS Credit 8 Light Pollution Reduction <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | Water Efficiency <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | WE Credit 1.1 Water Efficient Landscaping: Reduce by 50% <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | WE Credit 1.2 Water Efficient Landscaping: No Potable Water Use or No Irrigation <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | WE Credit 2 Innovative Wastewater Technologies <\/td>\n<\/tr>\n | ||||||
139<\/td>\n | WE Credit 3.1 Water Use Reduction: 20% Reduction <\/td>\n<\/tr>\n | ||||||
140<\/td>\n | WE Credit 3.2 Water Use Reduction: 30% Reduction <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | Energy & Atmosphere <\/td>\n<\/tr>\n | ||||||
153<\/td>\n | EA Prerequisite 1 Fundamental Commissioning of the Building Energy Systems <\/td>\n<\/tr>\n | ||||||
165<\/td>\n | EA Prerequisite 2 Minimum Energy Performance <\/td>\n<\/tr>\n | ||||||
171<\/td>\n | EA Prerequisite 3 Fundamental Refrigerant Management <\/td>\n<\/tr>\n | ||||||
175<\/td>\n | EA Credit 1 Optimize Energy Performance <\/td>\n<\/tr>\n | ||||||
203<\/td>\n | EA Credit 2 OnySite Renewable Energy <\/td>\n<\/tr>\n | ||||||
211<\/td>\n | EA Credit 3 Enhanced Commissioning <\/td>\n<\/tr>\n | ||||||
217<\/td>\n | EA Credit 4 Enhanced Refrigerant Management <\/td>\n<\/tr>\n | ||||||
227<\/td>\n | EA Credit 5 Measurement & Verification <\/td>\n<\/tr>\n | ||||||
233<\/td>\n | EA Credit 6 Green Power <\/td>\n<\/tr>\n | ||||||
239<\/td>\n | Materials & Resources <\/td>\n<\/tr>\n | ||||||
243<\/td>\n | MR Prerequisite 1 Storage & Collection of Recyclables <\/td>\n<\/tr>\n | ||||||
247<\/td>\n | MR Credit 1.1 Building Reuse: Maintain 75% of Existing Walls, Floors & Roof <\/td>\n<\/tr>\n | ||||||
248<\/td>\n | MR Credit 1.2 Building Reuse: Maintain 95% of Existing Walls, Floors & Roof <\/td>\n<\/tr>\n | ||||||
249<\/td>\n | MR Credit 1.3 Building Reuse: Maintain 50% of Interior NonyStructural Elements <\/td>\n<\/tr>\n | ||||||
255<\/td>\n | MR Credit 2.1 Construction Waste Management: Divert 50% From Disposal <\/td>\n<\/tr>\n | ||||||
256<\/td>\n | MR Credit 2.2 Construction Waste Management: Divert 75% From Disposal <\/td>\n<\/tr>\n | ||||||
263<\/td>\n | MR Credit 3.1 Materials Reuse: 5% <\/td>\n<\/tr>\n | ||||||
264<\/td>\n | MR Credit 3.2 Materials Reuse: 10% <\/td>\n<\/tr>\n | ||||||
269<\/td>\n | MR Credit 4.1 Recycled Content: 10% (post-consumer + 1\/2 pre-consumer <\/td>\n<\/tr>\n | ||||||
270<\/td>\n | MR Credit 4.2 Recycled Content: 20% (post-consumer + 1\/2 pre-consumer) <\/td>\n<\/tr>\n | ||||||
277<\/td>\n | MR Credit 5.1 Regional Materials: 10% Extracted, Processed & Manufactured Regionally <\/td>\n<\/tr>\n | ||||||
278<\/td>\n | MR Credit 5.2 Regional Materials: 20% Extracted, Processed & Manufactured Regionally <\/td>\n<\/tr>\n | ||||||
283<\/td>\n | MR Credit 6 Rapidly Renewable Materials <\/td>\n<\/tr>\n | ||||||
287<\/td>\n | MR Credit 7 Certified Wood <\/td>\n<\/tr>\n | ||||||
293<\/td>\n | Indoor Environmental Quality <\/td>\n<\/tr>\n | ||||||
295<\/td>\n | EH Prerequisite 1 Minimum IAH Performance <\/td>\n<\/tr>\n | ||||||
301<\/td>\n | EH Prerequisite 2 Environmental Tobacco Smoke (ETS) Control <\/td>\n<\/tr>\n | ||||||
307<\/td>\n | EH Credit 1 Outdoor Air Delivery Monitoring <\/td>\n<\/tr>\n | ||||||
313<\/td>\n | EH Credit 2 Increased Ventilation <\/td>\n<\/tr>\n | ||||||
323<\/td>\n | EH Credit 3.1 Construction IAH Management Plan: During Construction <\/td>\n<\/tr>\n | ||||||
329<\/td>\n | EH Credit 3.2 Construction IAH Management Plan: Before Occupancy <\/td>\n<\/tr>\n | ||||||
339<\/td>\n | EH Credit 4.1 LowyEmitting Materials: Adhesives & Sealants <\/td>\n<\/tr>\n | ||||||
343<\/td>\n | EH Credit 4.2 LowyEmitting Materials: Paints & Coatings <\/td>\n<\/tr>\n | ||||||
347<\/td>\n | EH Credit 4.3 LowyEmitting Materials: Carpet Systems <\/td>\n<\/tr>\n | ||||||
351<\/td>\n | EH Credit 4.4 LowyEmitting Materials: Composite Wood & Agrifiber Products <\/td>\n<\/tr>\n | ||||||
359<\/td>\n | EH Credit 5 Indoor Chemical & Pollutant Source Control <\/td>\n<\/tr>\n | ||||||
363<\/td>\n | EH Credit 6.1 Controllability of Systems: Lighting <\/td>\n<\/tr>\n | ||||||
367<\/td>\n | EH Credit 6.2 Controllability of Systems: Thermal Comfort <\/td>\n<\/tr>\n | ||||||
371<\/td>\n | EH Credit 7.1 Thermal Comfort: Design <\/td>\n<\/tr>\n | ||||||
375<\/td>\n | EH Credit 7.2 Thermal Comfort: Verification <\/td>\n<\/tr>\n | ||||||
379<\/td>\n | EH Credit 8.1 Daylight & Views: Daylight 75% of Spaces <\/td>\n<\/tr>\n | ||||||
389<\/td>\n | EH Credit 8.2 Daylight & Views: Views for 90% of Spaces <\/td>\n<\/tr>\n | ||||||
395<\/td>\n | Innovation in Design <\/td>\n<\/tr>\n | ||||||
397<\/td>\n | ID Credit 1 – 1.4 Innovation in Design <\/td>\n<\/tr>\n | ||||||
401<\/td>\n | ID Credit 2 LEED Accredited Professional <\/td>\n<\/tr>\n | ||||||
403<\/td>\n | Glossary of Terms <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" LEED for New Construction v2.2 Reference Guide, Third Edition<\/b><\/p>\n |