{"id":424242,"date":"2024-10-20T06:50:47","date_gmt":"2024-10-20T06:50:47","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-16603-20-072022-tc\/"},"modified":"2024-10-26T12:51:37","modified_gmt":"2024-10-26T12:51:37","slug":"bs-en-16603-20-072022-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-16603-20-072022-tc\/","title":{"rendered":"BS EN 16603-20-07:2022 – TC"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\n30467226 <\/td>\n<\/tr>\n
113<\/td>\nA-30437740 <\/td>\n<\/tr>\n
114<\/td>\nundefined <\/td>\n<\/tr>\n
124<\/td>\n1 Scope <\/td>\n<\/tr>\n
125<\/td>\n2 Normative references <\/td>\n<\/tr>\n
126<\/td>\n3 Terms, definitions and abbreviated terms
3.1 Terms from other standards <\/td>\n<\/tr>\n
127<\/td>\n3.2 Terms specific to the present standard <\/td>\n<\/tr>\n
129<\/td>\n3.3 Abbreviated terms <\/td>\n<\/tr>\n
131<\/td>\n4 Requirements
4.1 General system requirements
4.2 Detailed system requirements
4.2.1 Overview
4.2.2 EMC with the launch system
4.2.2.1 Overview
4.2.2.2 Detailed system requirements <\/td>\n<\/tr>\n
132<\/td>\n4.2.3 Lightning environment
4.2.3.1 Overview
4.2.3.2 Requirements to the space system
4.2.4 Spacecraft charging and effects
4.2.4.1 Overview
4.2.4.2 EMI control requirements to system and equipment in relation with ESD <\/td>\n<\/tr>\n
133<\/td>\n4.2.5 Spacecraft DC magnetic emission
4.2.5.1 Spacecraft with susceptible payload
4.2.5.2 Attitude control system (ACS)
4.2.6 Radiofrequency compatibility <\/td>\n<\/tr>\n
134<\/td>\n4.2.7 Hazards of electromagnetic radiation
4.2.8 Intrasystem EMC
4.2.9 EMC with ground equipment <\/td>\n<\/tr>\n
135<\/td>\n4.2.10 Grounding
4.2.10.1 Overview
4.2.10.2 Requirements
4.2.11 Electrical bonding requirements
4.2.11.1 Overview <\/td>\n<\/tr>\n
136<\/td>\n4.2.11.2 Normative provisions
4.2.11.3 External grounds <\/td>\n<\/tr>\n
137<\/td>\n4.2.12 Shielding (except wires and cables)
4.2.12.1 Overview
4.2.12.2 Requirements
4.2.13 Wiring (including wires and cables shielding)
4.2.13.1 Classification of cables
4.2.13.2 Cable shields <\/td>\n<\/tr>\n
139<\/td>\n5 Verification
5.1 Overview
5.1.1 Introduction
5.1.2 Electromagnetic effects verification plan
5.1.3 Electromagnetic effects verification report
5.2 Test conditions
5.2.1 Measurement tolerances <\/td>\n<\/tr>\n
140<\/td>\n5.2.2 Test site
5.2.2.1 Overview
5.2.2.2 Shielded enclosures <\/td>\n<\/tr>\n
141<\/td>\n5.2.2.3 Ambient electromagnetic level
5.2.2.4 Ambient conducted level <\/td>\n<\/tr>\n
142<\/td>\n5.2.3 Ground plane
5.2.3.1 General
5.2.3.2 Metallic ground plane
5.2.3.3 Composite ground plane
5.2.4 Power source impedance <\/td>\n<\/tr>\n
144<\/td>\n5.2.5 General test precautions
5.2.5.1 Safety
5.2.5.2 Excess personnel and equipment
5.2.5.3 Overload precautions
5.2.6 EUT test configurations
5.2.6.1 General <\/td>\n<\/tr>\n
145<\/td>\n5.2.6.2 Bonding of EUT
5.2.6.3 Shock and vibration isolators
5.2.6.4 Safety grounds
5.2.6.5 Orientation of EUTs <\/td>\n<\/tr>\n
146<\/td>\n5.2.6.6 Construction and arrangement of EUT cables <\/td>\n<\/tr>\n
147<\/td>\n5.2.6.7 Electrical and mechanical interfaces
5.2.7 Operation of EUT
5.2.7.1 General <\/td>\n<\/tr>\n
148<\/td>\n5.2.7.2 Operating frequencies for tuneable RF equipment
5.2.7.3 Operating frequencies for spread spectrum equipment
5.2.7.4 Susceptibility monitoring
5.2.8 Use of measurement equipment
5.2.8.1 Overview <\/td>\n<\/tr>\n
149<\/td>\n5.2.8.2 Detector
5.2.8.3 Calibration fixture (jig) <\/td>\n<\/tr>\n
150<\/td>\n5.2.9 Emission testing
5.2.9.1 Bandwidths
5.2.9.2 Emission identification
5.2.9.3 Frequency scanning <\/td>\n<\/tr>\n
151<\/td>\n5.2.9.4 Emission data presentation
5.2.10 Susceptibility testing
5.2.10.1 Frequency stepping <\/td>\n<\/tr>\n
152<\/td>\n5.2.10.2 Modulation of susceptibility signals <\/td>\n<\/tr>\n
153<\/td>\n5.2.10.3 Thresholds of susceptibility
5.2.10.4 Susceptibility data presentation
5.2.11 Calibration of measuring equipment
5.2.11.1 General
5.2.11.2 Measurement system test <\/td>\n<\/tr>\n
154<\/td>\n5.2.12 Power bus voltage
5.2.13 Photographic data
5.3 System level
5.3.1 General
5.3.2 Safety margin demonstration for critical or EED circuits <\/td>\n<\/tr>\n
155<\/td>\n5.3.3 EMC with the launch system
5.3.4 Lightning
5.3.5 Spacecraft and static charging <\/td>\n<\/tr>\n
156<\/td>\n5.3.6 Spacecraft DC magnetic field emission
5.3.7 Intra\u2013system electromagnetic compatibility
5.3.8 Radiofrequency compatibility
5.3.9 Grounding
5.3.10 Electrical bonding
5.3.11 Wiring and shielding <\/td>\n<\/tr>\n
157<\/td>\n5.4 Equipment and subsystem level test procedures
5.4.1 Overview
5.4.2 CE, power leads, differential mode, 30 Hz to 100 kHz
5.4.2.1 Purpose
5.4.2.2 Test equipment <\/td>\n<\/tr>\n
158<\/td>\n5.4.2.3 Setup
5.4.2.4 Procedure <\/td>\n<\/tr>\n
159<\/td>\n5.4.3 CE, power and signal leads, 50 kHz to 100 MHz
5.4.3.1 Purpose <\/td>\n<\/tr>\n
160<\/td>\n5.4.3.2 Test equipment
5.4.3.3 Setup <\/td>\n<\/tr>\n
161<\/td>\n5.4.3.4 Procedures <\/td>\n<\/tr>\n
162<\/td>\n5.4.4 CE, power leads, inrush current
5.4.4.1 Purpose
5.4.4.2 Test equipment <\/td>\n<\/tr>\n
163<\/td>\n5.4.4.3 Setup <\/td>\n<\/tr>\n
164<\/td>\n5.4.4.4 Procedures <\/td>\n<\/tr>\n
165<\/td>\n5.4.4.5 Data presentation
5.4.5 DC Magnetic field emission, magnetic moment
5.4.5.1 Overview <\/td>\n<\/tr>\n
166<\/td>\n5.4.5.2 Set-Up
5.4.5.3 Test sequence <\/td>\n<\/tr>\n
167<\/td>\n5.4.5.4 Data presentation <\/td>\n<\/tr>\n
168<\/td>\n5.4.6 RE, electric field, 30 MHz to 18 GHz
5.4.6.1 Purpose
5.4.6.2 Test equipment <\/td>\n<\/tr>\n
169<\/td>\n5.4.6.3 Test setup <\/td>\n<\/tr>\n
171<\/td>\n5.4.6.4 Test procedures <\/td>\n<\/tr>\n
172<\/td>\n5.4.6.5 Data Presentation
5.4.7 CS, power leads, 30 Hz to 100 kHz
5.4.7.1 Purpose
5.4.7.2 Test equipment <\/td>\n<\/tr>\n
173<\/td>\n5.4.7.3 Setup <\/td>\n<\/tr>\n
174<\/td>\n5.4.7.4 Procedures <\/td>\n<\/tr>\n
175<\/td>\n5.4.8 CS, bulk cable injection, 50 kHz to 100 MHz
5.4.8.1 Purpose
5.4.8.2 Test equipment
5.4.8.3 Setup <\/td>\n<\/tr>\n
176<\/td>\n5.4.8.4 Test procedures <\/td>\n<\/tr>\n
179<\/td>\n5.4.9 CS, power leads, transients
5.4.9.1 Purpose
5.4.9.2 Test equipment <\/td>\n<\/tr>\n
180<\/td>\n5.4.9.3 Setup <\/td>\n<\/tr>\n
182<\/td>\n5.4.9.4 Procedures <\/td>\n<\/tr>\n
183<\/td>\n5.4.10 RS, magnetic field, 30 Hz to 100 kHz
5.4.10.1 Purpose
5.4.10.2 Test equipment
5.4.10.3 Setup <\/td>\n<\/tr>\n
184<\/td>\n5.4.10.4 Test procedures <\/td>\n<\/tr>\n
185<\/td>\n5.4.10.5 Data Presentation <\/td>\n<\/tr>\n
186<\/td>\n5.4.11 RS, electric field, 30 MHz to 18 GHz
5.4.11.1 Purpose and overview
5.4.11.2 Test equipment <\/td>\n<\/tr>\n
187<\/td>\n5.4.11.3 Test setup <\/td>\n<\/tr>\n
190<\/td>\n5.4.11.4 Test procedures <\/td>\n<\/tr>\n
192<\/td>\n5.4.11.5 Test report content and data presentation <\/td>\n<\/tr>\n
193<\/td>\n5.4.12 Susceptibility to wire-coupled electrostatic discharges (legacy method)
5.4.12.1 Overview
5.4.12.2 Test equipment <\/td>\n<\/tr>\n
194<\/td>\n5.4.12.3 Setup <\/td>\n<\/tr>\n
196<\/td>\n5.4.12.4 Procedure <\/td>\n<\/tr>\n
197<\/td>\n5.4.12.5 Data presentation <\/td>\n<\/tr>\n
198<\/td>\n5.4.13 Susceptibility to wire-coupled electrostatic discharges (current injection probe method)
5.4.13.1 Overview
5.4.13.2 Test equipment
5.4.13.3 Calibration <\/td>\n<\/tr>\n
200<\/td>\n5.4.13.4 EUT testing <\/td>\n<\/tr>\n
201<\/td>\n5.4.13.5 Data presentation
5.4.14 Susceptibility to electrostatic discharges into the chassis
5.4.14.1 Overview
5.4.14.2 Test equipment <\/td>\n<\/tr>\n
202<\/td>\n5.4.14.3 Test setup
5.4.14.4 Procedure <\/td>\n<\/tr>\n
204<\/td>\n5.4.14.5 Data presentation
5.4.15 CE, power leads, time domain
5.4.15.1 Purpose
5.4.15.2 Test equipment
5.4.15.3 Test setup <\/td>\n<\/tr>\n
205<\/td>\n5.4.15.4 Procedure
5.4.15.5 Data presentation <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Tracked Changes. Space engineering. Electromagnetic compatibility<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2023<\/td>\n218<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":424249,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-424242","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/424242","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/424249"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=424242"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=424242"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=424242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}