ASME B31.8S 2004
$98.04
ASME B31.8S Managing System Integrity of Gas Pipelines
Published By | Publication Date | Number of Pages |
ASME | 2004 | 70 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | CONTENTS FIGURES TABLES |
5 | NONMANDATORY APPENDICES |
6 | FOREWORD |
7 | COMMITTEE ROSTER |
9 | SUMMARY OF CHANGES |
10 | 1 INTRODUCTION 1.1 Scope 1.2 Purpose and Objectives 1.3 Integrity Management Principles |
11 | 2 INTEGRITY MANAGEMENT PROGRAM OVERVIEW 2.1 General |
12 | 2.2 Integrity Threat Classification 1 Integrity Management Program Elements |
13 | 2 Integrity Management Plan Process Flow Diagram |
14 | 2.3 The Integrity Management Process 2.3.1 Identify Potential Pipeline Impact by Threat 2.3.2 Gathering, Reviewing, and Integrating Data 2.3.3 Risk Assessment 2.3.4 Integrity Assessment |
15 | 2.3.5 Responses to Integrity Assessment, Mitigation Repair and Prevention, and Setting Inspection Intervals 2.3.6 Update, Integrate, and Review Data 2.3.7 Reassess Risk 2.4 Integrity Management Program 2.4.1 Integrity Management Plan 2.4.2 Performance Plan 2.4.3 Communications Plan |
16 | 2.4.4 Management of Change Plan 2.4.5 Quality Control Plan 3 CONSEQUENCES 3.1 General 3.2 Potential Impact Area |
17 | 3.3 Consequence Factors to Consider 4 GATHERING, REVIEWING, AND INTEGRATING DATA 4.1 General 4.2 Data Requirements 3 Potential Impact Area |
18 | 4.2.1 Prescriptive Integrity Management Programs 4.2.2 Performance-Based Integrity Management Programs 4.3 Data Sources 1 Data Elements for Prescriptive Pipeline Integrity Program |
19 | 4.4 Data Collection, Review, and Analysis 4.5 Data Integration 2 Typical Data Sources for Pipeline Integrity Program |
20 | 5 RISK ASSESSMENT 5.1 Introduction 5.2 Definition 5.3 Risk Assessment Objectives 5.4 Developing a Risk Assessment Approach |
21 | 5.5 Risk Assessment Approaches 5.6 Risk Analysis 5.6.1 Risk Analysis for Prescriptive Integrity Management Programs |
22 | 5.6.2 Risk Analysis for Performance-Based Integrity Management Programs 5.7 Characteristics of an Effective Risk Assessment Approach 3 Integrity Assessment Intervals: Time-Dependent Threats, Prescriptive Integrity Management Plan |
23 | 5.8 Risk Estimates Using Assessment Methods |
24 | 5.9 Data Collection for Risk Assessment 5.10 Prioritization for Prescriptive-Based and Performance-Based Integrity Management Programs |
25 | 5.11 Integrity Assessment and Mitigation 5.12 Validation 6 INTEGRITY ASSESSMENT 6.1 General |
26 | 6.2 Pipeline In-Line Inspection 6.2.1 Metal Loss Tools for the Internal and External Corrosion Threat 6.2.2 Crack Detection Tools for the Stress Corrosion Cracking Threat 6.2.3 Metal Loss and Caliper Tools for Third-Party Damage and Mechanical Damage Threat |
27 | 6.2.4 All Other Threats 6.2.5 Special Considerations for the Use of In-Line Inspection Tools 6.2.6 Examination and Evaluation 6.3 Pressure Testing |
28 | 6.3.1 Time-Dependent Threats 6.3.2 Manufacturing and Related Defect Threats 6.3.3 All Other Threats 6.3.4 Examination and Evaluation 6.4 Direct Assessment 6.4.1 External Corrosion Direct Assessment ECDA for the External Corrosion Threat 6.4.2 Internal Corrosion Direct Assessment Process ICDA for the Internal Corrosion Threat |
29 | 6.4.3 All Other Threats 6.5 Other Integrity Assessment Methodologies 7 RESPONSES TO INTEGRITY ASSESSMENTS AND MITIGATION REPAIR AND PREVENTION 7.1 General 7.2 Responses to Pipeline In-Line Inspections 7.2.1 Metal Loss Tools for Internal and External Corrosion |
30 | 4 Acceptable Threat Prevention and Repair Methods |
32 | 7.2.2 Crack Detection Tools for Stress Corrosion Cracking 7.2.3 Metal Loss and Caliper Tools for Third-Party Damage and Mechanical Damage 7.2.4 Limitations to Response Times for Prescriptive-Based Program 4 Timing for Scheduled Responses: Time-Dependent Threats, Prescriptive Integrity Management Plan |
33 | 7.2.5 Extending Response Times for Performance-Based Program 7.3 Responses to Pressure Testing 7.3.1 External and Internal Corrosion Threats 7.3.2 Stress Corrosion Cracking Threat 7.3.3 Manufacturing and Related Defect Threats 7.4 Responses to Direct Assessment Inspections 7.4.1 External Corrosion Direct Assessment ECDA 7.4.2 Internal Corrosion Direct Assessment ICDA 7.5 Repair Methods |
34 | 7.6 Prevention Strategy/Methods 7.7 Prevention Options 8 INTEGRITY MANAGEMENT PLAN 8.1 General 8.2 Updating the Plan |
35 | 8.3 Plan Framework 8.3.1 Gathering, Reviewing, and Integrating Data 8.3.2 Assess Risk 8.3.3 Integrity Assessment 8.3.4 Responses to Integrity Assessment, Mitigation Repair and Prevention, and Intervals 9 PERFORMANCE PLAN 9.1 Introduction |
36 | 9.2 Performance Measures Characteristics 9.2.1 Process or Activity Measures 9.2.2 Operational Measures 5 Example of Integrity Management Plan for Hypothetical Pipeline Segment (Segment Data: Line 1, Segment 3) |
37 | 9.2.3 Direct Integrity Measures 9.3 Performance Measurement Methodology 9.4 Performance Measurement: Intrasystem 6 Example of Integrity Management Plan for Hypothetical Pipeline Segment (Integrity Assessment Plan: Line 1, Segment 3) 7 Example of Integrity Management Plan for Hypothetical Pipeline Segment (Mitigation Plan: Line 1, Segment 3) |
38 | 8 Performance Measures |
39 | 9.5 Performance Measurement: Industry Based 9.6 Performance Improvement 10 COMMUNICATIONS PLAN 10.1 General 9 Performance Metrics |
40 | 10.2 External Communications 10 Overall Performance Measures |
41 | 10.3 Internal Communications 11 MANAGEMENT OF CHANGE PLAN |
42 | 12 QUALITY CONTROL PLAN 12.1 General 12.2 Quality Management Control 13 TERMS, DEFINITIONS, AND ACRONYMS |
43 | 5 Hierarchy of Terminology for Integrity Assessment |
45 | 14 REFERENCES AND STANDARDS |
48 | A THREAT PROCESS CHARTS AND PRESCRIPTIVE INTEGRITY MANAGEMENT PLANS A1 EXTERNAL CORROSION THREAT A1.1 Scope A1.2 Gathering, Reviewing, and Integrating Data A1.3 Criteria and Risk Assessment A1.4 Integrity Assessment |
49 | A1.5 Responses and Mitigation |
50 | A1.6 Other Data A1.7 Assessment Interval A1.8 Performance Measures A2 INTERNAL CORROSION THREAT A2.1 Scope A2.2 Gathering, Reviewing, and Integrating Data A2.3 Criteria and Risk Assessment |
51 | A2.4 Integrity Assessment A2.5 Responses and Mitigation |
52 | A2.6 Other Data A2.7 Assessment Interval A2.8 Performance Metrics A3 STRESS CORROSION CRACKING THREAT A3.1 Scope A3.2 Gathering, Reviewing, and Integrating Data A3.3 Criteria and Risk Assessment |
54 | A3.4 Integrity Assessment A3.4.1 Bell Hole Examination and Evaluation Method A3.4.2 Hydrostatic Testing for SCC A3.5 Other Data A3.6 Performance Measures |
55 | A4 MANUFACTURING THREAT PIPE SEAM AND PIPE A4.1 Scope A4.2 Gathering, Reviewing, and Integrating Data |
56 | A4.3 Criteria and Risk Assessment A4.4 Integrity Assessment A4.5 Responses and Mitigation A4.6 Other Data A4.7 Assessment Interval A4.8 Performance Measures A5 CONSTRUCTION THREAT PIPE GIRTH WELD, FABRICATION WELD, WRINKLE BEND OR BUCKLE, STRIPPED THREADS/BROKEN PIPE/COUPLING A5.1 Scope A5.2 Gathering, Reviewing, and Integrating Data |
57 | A5.3 Criteria and Risk Assessment |
58 | A5.4 Integrity Assessment A5.5 Responses and Mitigation A5.6 Other Data A5.7 Assessment Interval A5.8 Performance Measures A6 EQUIPMENT THREAT GASKETS AND O-RINGS, CONTROL/RELIEF, SEAL/PUMP PACKING A6.1 Scope A6.2 Gathering, Reviewing, and Integrating Data A6.3 Criteria and Risk Assessment A6.4 Integrity Assessment |
59 | A6.5 Responses and Mitigation A6.6 Other Data A6.7 Assessment Interval A6.8 Performance Measures |
60 | A7 THIRD-PARTY DAMAGE THREAT THIRD-PARTY INFLICTED DAMAGE IMMEDIATE, VANDALISM, PREVIOUSLY DAMAGED PIPE A7.1 Scope A7.2 Gathering, Reviewing, and Integrating Data |
61 | A7.3 Criteria and Risk Assessment A7.4 Integrity Assessment A7.5 Responses and Mitigation A7.6 Other Data A7.7 Assessment Interval A7.8 Performance Measures A8 INCORRECT OPERATIONS THREAT A8.1 Scope A8.2 Gathering, Reviewing, and Integrating Data A8.3 Criteria and Risk Assessment A8.4 Integrity Assessment |
62 | A8.5 Responses and Mitigation A8.6 Other Data A8.7 Assessment Interval |
63 | A8.8 Performance Measures A9 WEATHER-RELATED AND OUTSIDE FORCE THREAT EARTH MOVEMENT, HEAVY RAINS OR FLOODS, COLD WEATHER, LIGHTNING A9.1 Scope A9.2 Gathering, Reviewing, and Integrating Data A9.3 Criteria and Risk Assessment A9.4 Integrity Assessment A9.5 Responses and Mitigation A9.6 Other Data A9.7 Assessment Interval |
64 | A9.8 Performance Measures |
65 | B DIRECT ASSESSMENT PROCESS B1 EXTERNAL CORROSION DIRECT ASSESSMENT B1.1 Pre-Assessment B1.2 Indirect Examinations |
66 | B1.3 Direct Examinations B1.4 Post-Assessment |
67 | B2 INTERNAL CORROSION DIRECT ASSESSMENT B2.1 Pre-Assessment B2.2 Selecting Local Examination Points |
68 | B2.3 Local Examination B2.4 Post-Assessment |
69 | C PREPARATION OF TECHNICAL INQUIRIES C1 INTRODUCTION C2 REQUIREMENTS C3 SUBMITTAL |