{"id":72882,"date":"2024-10-17T16:25:22","date_gmt":"2024-10-17T16:25:22","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/awwa-c517-2009\/"},"modified":"2024-10-24T19:08:27","modified_gmt":"2024-10-24T19:08:27","slug":"awwa-c517-2009","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/awwa\/awwa-c517-2009\/","title":{"rendered":"AWWA C517 2009"},"content":{"rendered":"
This standard describes resilient-seated cast-iron eccentric plug valves, 3 in. (75mm) through 72 in. (1,800 mm) in diameter, with flanged, grooved, or mechanical-joint ends.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | ANSI\/AWWA C517-09 <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Committee Personnel <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword I. Introduction. <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | II. Special Issues. <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | III. Use of This Standard. <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | IV. Major Revisions. V. Comments. <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | AWWA Standard Resilient-Seated Cast-Iron \nEccentric Plug Valves \n SECTION 1: GENERAL Sec. 1.1 Scope Sec. 1.2 Purpose Sec. 1.3 Application <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | SECTION 2: REFERENCES SECTION 3: DEFINITIONS <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | SECTION 4: REQUIREMENTS Sec. 4.1 Permeation Sec. 4.2 Data to Be Provided by the Manufacturer or Supplier Sec. 4.3 Materials <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Sec. 4.4 Design <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Table 1 End-to-end dimensions for flanged-end valves <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Table 2 Prototype actuator test cycles required <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Sec. 4.5 Workmanship and Coating <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | SECTION 5: VERIFICATION Sec. 5.1 Inspection Sec. 5.2 Testing Table 3 Minimum duration of shell and seat tests <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Table 4 Valve test cycles required <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Sec. 5.3 Rejection SECTION 6: DELIVERY Sec. 6.1 Marking Sec. 6.2 Shipping Sec. 6.3 Affidavit of Compliance <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | APPENDIX A Installation, Operation, and Maintenance of \nResilient-Seated Cast-Iron Eccentric Plug Valves \n SECTION A.1: GENERAL SECTION A.2: UNLOADING SECTION A.3: STORAGE <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | SECTION A.4: INSPECTION PRIOR TO \nINSTALLATION SECTION A.5: INSTALLATION Sec. A.5.1 Handling Sec. A.5.2 Service Conditions Sec. A.5.3 Buried Installations Sec. A.5.4 Cleaning <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Sec. A.5.5 Pipe Ends Sec. A.5.6 Installation <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Sec. A.5.7 Valve Boxes Sec. A.5.8 Valves Installed in Vaults SECTION A.6: TESTING Sec. A.6.1 Leaks Sec. A.6.2 Seat Leakage <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | SECTION A.7: RECORDS SECTION A.8: OPERATION Sec. A.8.1 Design Pressure Sec. A.8.2 Input Torque Sec. A.8.3 Sticking SECTION A.9: MAINTENANCE <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Sec. A.9.1 Normal Maintenance Sec. A.9.2 Valve Exercising Sec. A.9.3 Field Repairs Sec. A.9.4 Isolation Sec. A.9.5 Repair Testing Sec. A.9.6 Valve Removal <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" AWWA C517-09: Resilient-Seated Cast-Iron Eccentric Plug Valves<\/b><\/p>\n |