{"id":273257,"date":"2024-10-19T18:21:11","date_gmt":"2024-10-19T18:21:11","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-16946-12017\/"},"modified":"2024-10-25T14:42:05","modified_gmt":"2024-10-25T14:42:05","slug":"bs-en-16946-12017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-16946-12017\/","title":{"rendered":"BS EN 16946-1:2017"},"content":{"rendered":"
This European Standard defines guidelines for the inspection of installed an operational Functions of Building Automation, Controls and Technical Building Managment System including its configuration.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | European foreword <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 2 Normative references 3 Terms and definitions 4 Overview <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 5 Inspection method 5.1 General 5.2 Inspection procedure 5.3 Major steps in the inspection <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.4 Determination of energy efficiency contribution 5.5 Weighting among building types 5.6 BAC overall energy performance scale and evaluation <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 6 Inspection of a BAC in the phases of BAC project 6.1 General 6.2 Design phase 6.2.1 Activities 6.2.2 Role of the inspection 6.3 Engineering phase 6.3.1 Activities 6.3.2 Role of the inspection <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 6.4 Installation phase 6.4.1 Activities 6.4.2 Role of the inspection 6.5 Completion phase 6.5.1 Activities 6.5.2 Role of the inspection 6.6 Documentation 6.6.1 General 6.6.2 Role of the inspection <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6.7 Operator instruction (training) 6.7.1 General 6.7.2 Role of the inspection 6.8 Review and improve building performance 6.9 Inspection of BACS sometime after the handover <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Annex A (informative) Audit Processes <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Annex B (informative) Schematic supply flow and controls functions influencing the efficiency <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Annex C (informative) Key Performance Indicators <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Energy Performance of Buildings. Inspection of Automation, Controls and Technical Building Management – Module M10-11<\/b><\/p>\n |