{"id":446130,"date":"2024-10-20T08:45:16","date_gmt":"2024-10-20T08:45:16","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-8528-62023\/"},"modified":"2024-10-26T16:18:28","modified_gmt":"2024-10-26T16:18:28","slug":"bs-iso-8528-62023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-8528-62023\/","title":{"rendered":"BS ISO 8528-6:2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms, definitions and abbreviations 3.1 Terms and definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3.2 Abbreviated terms 4 Other regulations and additional requirements <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5 General test requirements 5.1 General <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.2 Measurement equipment accuracy <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6 Functional test 6.1 General 6.1.1 General 6.1.2 Physical functional test 6.1.3 Functional test by simulation 6.2 General inspection <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.3 Measurements 6.4 Functional test report <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 7 Type test 7.1 General 7.2 Testing conditions <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 7.3 Characterisation of performance class 7.3.1 Steady state verification at constant power <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 7.3.2 Verification of power-sharing capability 7.3.3 Step load test <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7.3.4 Start and stop time characteristics <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 7.4 Reactive power capability 7.4.1 General 7.4.2 Verification of reactive power capability <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 7.4.3 Test method for verification of reactive power capability control methods <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 7.5 Verification of grid synchronization limits 7.5.1 General 7.5.2 Testing method for verification of grid synchronisation limits <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 7.6 Test method for verification of FRT capability 7.6.1 General 7.6.2 Aim of the test 7.6.3 Documents to be provided before test <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 7.6.4 Test method <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 7.6.5 Acceptance criteria 7.7 Test method for verification of active power response to frequency variation 7.7.1 General 7.7.2 Aim of the test <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 7.7.3 Documents to be provided before test 7.7.4 Test method <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 7.7.5 Acceptance criteria 7.8 Test method for verification of generating set protections 7.8.1 General 7.8.2 Verification of generating set disconnection time from the grid <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 7.8.3 Verification of protection limits <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 8 Simulation-method-based assessment 8.1 General <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 8.2 Specification of model blocks 8.2.1 General 8.2.2 Engine and engine controller or governor block <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 8.2.3 AC generator block 8.2.4 Generating set controller block 8.2.5 Excitation controller (AVR) block 8.2.6 Exciter block 8.2.7 Protective devices block <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 8.2.8 Measurement transformer (if applicable) 8.3 Simulation for ISO performance class in standalone island operation 8.3.1 General 8.3.2 Model validation for standalone island mode <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 8.4 Simulation for generating sets used in grid connected applications 8.4.1 General 8.4.2 Requirements and methodologies for model validation <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 8.4.3 Model validation for different grid requirements <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 8.5 Assessment for generating set family 8.5.1 Methodology 8.5.2 Assessment for ISO performance class for family 8.5.3 Assessment for type test for family in grid parallel application <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 9 Acceptance test 9.1 General 9.2 Responsibility 9.3 Preparation 9.3.1 Provision of auxiliary personnel, test equipment and operating materials <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 9.3.2 Acceptance test preparation at the installation site 9.3.3 Acceptance test preparation at the manufacturer’s site or facility 9.3.4 Preliminary safety checks on generating set prior to testing 9.4 Further details <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 9.5 Extent of acceptance test 9.5.1 General 9.5.2 Checks (C) <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 9.5.3 Measurements (M) <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 9.6 Accuracy of measurement equipment and acceptance test procedure 9.6.1 Measurement equipment accuracy 9.6.2 Warm-up time <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 9.6.3 Generating set load test duration 9.6.4 Performing acceptance tests at the manufacturer\u2019s works 9.6.5 Installation site acceptance test <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 9.7 Acceptance test report 9.7.1 General 9.7.2 General data <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 9.7.3 Additional measured data for acceptance test <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | Annex A (informative) Test method using OVRT\/UVRT test equipment <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Annex B (informative) Test method for frequency ride through requirements <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | Annex C (informative) Example load step test report <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Reciprocating internal combustion engine driven alternating current generating sets – Test methods<\/b><\/p>\n |