{"id":434671,"date":"2024-10-20T07:45:24","date_gmt":"2024-10-20T07:45:24","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-tr-99682023\/"},"modified":"2024-10-26T14:42:53","modified_gmt":"2024-10-26T14:42:53","slug":"bsi-pd-iso-tr-99682023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-tr-99682023\/","title":{"rendered":"BSI PD ISO\/TR 9968:2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5 Item definition 5.1 Objectives 5.2 General <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.3 OT is part of the item 5.3.1 General <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.3.2 Assumptions 5.3.3 Functionality 5.3.4 Internal elements and their functionality <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.3.5 Internal interfaces <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.3.6 Other objects 5.3.7 External interfaces <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.4 OT is not part of the item <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.5 Safe intended functionality of the item 6 HARA and safety concepts 6.1 Objectives 6.2 General <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.3 Case 1: Malfunctioning behaviour of the E\/E systems can cause hazards related to the OT <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.4 Case 2: Failure of OT causes E\/E failures <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.5 Case 3: Non-E\/E-functional hazards and related hazardous conditions are addressed by E\/E protection functions <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.6 Case 4: Safety measures of elements of other technologies addressing functional safety requirements and safety goals <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.7 Case 5: Combined OT and E\/E safety measures implementing a safety requirement <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 7 Verification and validation for RESS 7.1 OT related hazard and hazardous conditions <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 7.2 Case 1: Malfunctioning behaviour of the E\/E systems can cause hazards related to the OT 7.3 Case 2: Failure of OT causes E\/E failures 7.4 Case 3: Non-E\/E-functional hazards and related hazardous conditions are addressed by E\/E protection functions 7.5 Case 4: Safety measures of OT addressing functional safety requirements and safety goals. 7.6 Case 5: Combined OT and E\/E safety measures implementing a safety requirement <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 8 Production, operation, service and decommissioning (POSD) 8.1 Objectives 8.2 General 8.3 Planning for production, operation, service and decommissioning 8.4 Production 8.5 Operation <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 8.6 Service 8.7 Decommissioning <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Annex A (informative) HARA and FSC example <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Road vehicles. Functional safety. The application to generic rechargeable energy storage systems for new energy vehicle<\/b><\/p>\n |