{"id":410524,"date":"2024-10-20T05:40:49","date_gmt":"2024-10-20T05:40:49","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-cen-iso-ts-32502022\/"},"modified":"2024-10-26T10:27:19","modified_gmt":"2024-10-26T10:27:19","slug":"bsi-pd-cen-iso-ts-32502022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-cen-iso-ts-32502022\/","title":{"rendered":"BSI PD CEN ISO\/TS 3250:2022"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nundefined <\/td>\n<\/tr>\n
4<\/td>\nEuropean foreword
Endorsement notice <\/td>\n<\/tr>\n
7<\/td>\nForeword <\/td>\n<\/tr>\n
8<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions <\/td>\n<\/tr>\n
20<\/td>\n3.2 Abbreviations <\/td>\n<\/tr>\n
21<\/td>\n4 Application
4.1 Users of this document <\/td>\n<\/tr>\n
22<\/td>\n4.2 Framework conditions
4.2.1 General <\/td>\n<\/tr>\n
24<\/td>\n4.2.2 Quality assurance
4.2.3 HSE considerations <\/td>\n<\/tr>\n
25<\/td>\n4.2.4 Sustainability and climate change considerations
4.3 Business category <\/td>\n<\/tr>\n
26<\/td>\n4.4 Overview of PE calculation and reporting work process <\/td>\n<\/tr>\n
27<\/td>\n4.5 Limitations <\/td>\n<\/tr>\n
28<\/td>\n4.6 PE data exchange between operators in benchmarking
5 Performance measures
5.1 General
5.2 Production efficiency
5.2.1 PE forecasting <\/td>\n<\/tr>\n
29<\/td>\n5.2.2 PE calculation and reporting
5.2.3 Initial production performance <\/td>\n<\/tr>\n
30<\/td>\n5.3 PE measurement <\/td>\n<\/tr>\n
31<\/td>\n5.4 PE calculation methodology
5.4.1 PE calculation formula
5.4.2 PE boundary conditions and reporting period
5.5 Injection efficiency calculation formula <\/td>\n<\/tr>\n
32<\/td>\n6 Production
6.1 General
6.2 Material balance <\/td>\n<\/tr>\n
33<\/td>\n6.3 Export \u2013 measured product <\/td>\n<\/tr>\n
34<\/td>\n6.4 Conversion factors for oil equivalents
6.5 Injection
6.6 Disposal \u2013 general
6.7 Disposal \u2013 flaring or venting of large volumes
6.7.1 Production facilities with a gas export route (to sales)
6.7.2 Production facilities with a gas injection route only <\/td>\n<\/tr>\n
35<\/td>\n6.7.3 Production facilities with no gas export route or other gas disposal routes
6.7.4 Flaring restrictions
6.8 Disposal \u2013 venting of small volumes
6.9 Fuel
6.10 Import <\/td>\n<\/tr>\n
36<\/td>\n6.11 Artificial lift
7 Production potential
7.1 General
7.2 Methods for determination of production potential
7.3 Structural maximum production potential (Method A) <\/td>\n<\/tr>\n
38<\/td>\n7.4 Achieved production potential (Method B)
7.5 Differences between Method A and Method B <\/td>\n<\/tr>\n
39<\/td>\n7.6 Adjusting the production potential <\/td>\n<\/tr>\n
41<\/td>\n7.7 Schedule delays <\/td>\n<\/tr>\n
42<\/td>\n7.8 Injection potential <\/td>\n<\/tr>\n
43<\/td>\n8 Production loss categories
8.1 General
8.2 Planned and unplanned events
8.3 Turnaround <\/td>\n<\/tr>\n
44<\/td>\n8.4 Modification
8.5 Pre-production
8.6 Flaring and venting of gas
8.7 Injection <\/td>\n<\/tr>\n
45<\/td>\n8.8 Accounting period <\/td>\n<\/tr>\n
46<\/td>\nAnnex A (normative) Production loss categorization <\/td>\n<\/tr>\n
57<\/td>\nAnnex B (informative) Performance measures for production availability <\/td>\n<\/tr>\n
60<\/td>\nAnnex C (normative) Taxonomy classification <\/td>\n<\/tr>\n
61<\/td>\nAnnex D (informative) Production loss subdivision with respect to system and equipment class <\/td>\n<\/tr>\n
67<\/td>\nAnnex E (informative) Examples <\/td>\n<\/tr>\n
79<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Petroleum, petrochemical and natural gas industries. Calculation and reporting production efficiency in the operating phase<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2022<\/td>\n82<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":410532,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-410524","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/410524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/410532"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=410524"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=410524"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=410524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}