{"id":409506,"date":"2024-10-20T05:35:52","date_gmt":"2024-10-20T05:35:52","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-42722022\/"},"modified":"2024-10-26T10:16:13","modified_gmt":"2024-10-26T10:16:13","slug":"bs-iso-42722022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-42722022\/","title":{"rendered":"BS ISO 4272:2022"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4 Symbols and abbreviated terms 4.1 Abbreviated terms 5 Types of truck platooning systems 5.1 Top-down-managed platooning 5.1.1 LV-managed platooning <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.1.2 BO- and LV-managed platooning 5.2 Peer-to-peer platooning 6 Types of truck platoon formation 6.1 Overview 6.2 Formation on the motorway 6.2.1 General 6.2.2 Ad-hoc platoon formation on the motorway 6.2.3 Planned platoon formation on the motorway <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 6.3 Formation at the staging area 6.3.1 Ad-hoc platoon formation at the staging area 6.3.2 Planned platoon formation at the staging area 7 Operation state diagram 7.1 General 7.2 Operation state diagram of platooning operations <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 8 Platooning operation control function (POCF) 8.1 General 8.2 Join <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 8.3 Leave <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 8.4 Operation 8.4.1 Join operation <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 8.4.2 Leave operation 8.5 Requirements 8.5.1 Join requirements <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 8.5.2 Leave requirements 9 Platooning manoeuvre control function (PMCF) 9.1 General 9.2 Longitudinal control <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 9.3 Lateral control <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 9.4 Longitudinal control operations 9.4.1 Join manoeuvre 9.4.2 Cruising operation 9.4.3 Leave manoeuvre 9.4.4 Cut-in operation <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 9.4.5 Cut-out operation 9.5 Lateral control operations 9.5.1 Cruising (in-lane) operation 9.5.2 Lane change operation <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 9.6 Longitudinal control requirements 9.6.1 Join manoeuvre requirements 9.6.2 Cruising requirements 9.6.3 Leave manoeuvre requirements <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 9.6.4 Cut-in requirements 9.6.5 Cut-out requirements 9.7 Lateral control requirements 9.7.1 Cruising requirements 9.7.2 Lane change requirements <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 10 Communication data (V2V\/V2I) 10.1 General 10.2 Requirements of communication 10.3 Communication data 10.3.1 General 10.3.2 Communication data for PMM <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 10.3.3 Communication data for PCM <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 11 Functional evaluation test method 11.1 Evaluation test conditions 11.2 Evaluation test method 11.2.1 General 11.2.2 Join evaluation test <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 11.2.3 Leave evaluation test <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 11.2.4 Cruising evaluation test <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 11.2.5 Cut-in evaluation test <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 11.2.6 Cut-out evaluation test <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Annex A (informative) Use cases of POCF <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex B (informative) Use cases of PMCF <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Intelligent transport systems. Truck platooning systems (TPS). Functional and operational requirements<\/b><\/p>\n |