{"id":407277,"date":"2024-10-20T05:25:30","date_gmt":"2024-10-20T05:25:30","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aisc-a207-2020\/"},"modified":"2024-10-26T09:52:01","modified_gmt":"2024-10-26T09:52:01","slug":"aisc-a207-2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aisc\/aisc-a207-2020\/","title":{"rendered":"AISC A207 2020"},"content":{"rendered":"

None<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nStandard for Certification Programs <\/td>\n<\/tr>\n
3<\/td>\nTitle Page <\/td>\n<\/tr>\n
4<\/td>\nCopyright
\n
Preface
\n <\/td>\n<\/tr>\n
7<\/td>\nTable of Contents
\n <\/td>\n<\/tr>\n
13<\/td>\nGlossary
\n <\/td>\n<\/tr>\n
19<\/td>\nChapter 1 General Requirements
\n
1.1 Purpose
\n
1.2 Scope
\n
1.3 References
\n <\/td>\n<\/tr>\n
20<\/td>\n1.4 Definitions
\n
1.5 Management Responsibility
\n <\/td>\n<\/tr>\n
23<\/td>\n1.6 Construction Document Review and Communication
\n <\/td>\n<\/tr>\n
24<\/td>\n1.7 Detailing
\n <\/td>\n<\/tr>\n
27<\/td>\n1.8 Control of Management System Documents and Project Documents
\n <\/td>\n<\/tr>\n
29<\/td>\n1.9 Maintenance of Quality Records
\n <\/td>\n<\/tr>\n
30<\/td>\n1.10 Purchasing
\n <\/td>\n<\/tr>\n
31<\/td>\n1.11 Material Identification
\n <\/td>\n<\/tr>\n
32<\/td>\n1.12 Process Controls
\n <\/td>\n<\/tr>\n
33<\/td>\n1.13 Inspection and Testing
\n <\/td>\n<\/tr>\n
35<\/td>\n1.14 Calibration of Inspection, Measuring, and Test Equipment
\n <\/td>\n<\/tr>\n
36<\/td>\n1.15 Control of Nonconformances
\n <\/td>\n<\/tr>\n
37<\/td>\n1.16 Corrective Action
\n <\/td>\n<\/tr>\n
38<\/td>\n1.17 Handling, Storage, and Delivery of Materials, Fabricated Work, and Components
\n
1.18 Training
\n
1.19 Internal Audit
\n <\/td>\n<\/tr>\n
39<\/td>\nChapter 2 Building Fabricator Requirements
\n
2.3 References
\n
2.5 Management Responsibility
\n <\/td>\n<\/tr>\n
41<\/td>\nChapter 3 Metal Component Manufacturer Requirements
\n
3.3 References
\n
3.5 Management Responsibility
\n <\/td>\n<\/tr>\n
42<\/td>\n3.7 Detailing
\n <\/td>\n<\/tr>\n
43<\/td>\nChapter 4
\nBridge Fabricator Requirements
4.2 Scope
\n <\/td>\n<\/tr>\n
44<\/td>\n4.3 References
\n
4.5 Management Responsibility
\n <\/td>\n<\/tr>\n
45<\/td>\n4.7 Detailing
\n <\/td>\n<\/tr>\n
46<\/td>\n4.11 Material Identification
\n
4.12 Process Controls
\n <\/td>\n<\/tr>\n
47<\/td>\nChapter 4.I Supplemental Requirements for Fabricators of Intermediate Bridges
\n
4.I.2 Scope
\n
4.I.5 Management Responsibility
\n
4.I.7 Detailing
\n <\/td>\n<\/tr>\n
48<\/td>\n4.I.12 Process Controls
\n <\/td>\n<\/tr>\n
49<\/td>\nChapter 4.A Supplemental Requirements for Fabricators of Advanced Bridges
\n
4.A.2 Scope
\n
4.A.6 Construction Document Review and Communication
\n <\/td>\n<\/tr>\n
50<\/td>\n4.A.12 Process Controls
\n <\/td>\n<\/tr>\n
51<\/td>\nChapter 4.F Supplemental Requirements for Fabricators of Fracture-Critical Members
\n
4.F.2 Scope
\n
4.F.5 Management Responsibility
\n
4.F.7 Detailing
\n <\/td>\n<\/tr>\n
52<\/td>\n4.F.10 Purchasing
\n
4.F.11 Material Identification
\n
4.F.12 Process Controls
\n
4.F.13 Inspection and Testing
4.F.15 Control of Nonconformances
\n <\/td>\n<\/tr>\n
53<\/td>\nChapter 5 Erector Requirements
\n
5.3 References
\n <\/td>\n<\/tr>\n
54<\/td>\n5.5 Management Responsibility
\n <\/td>\n<\/tr>\n
56<\/td>\n5.8 Control of Management System Documents and Project Documents
\n
5.10 Purchasing
\n <\/td>\n<\/tr>\n
57<\/td>\n5.12 Process Controls
\n
5.16 Corrective Action
\n
5.18 Training
\n <\/td>\n<\/tr>\n
58<\/td>\n5.19 Internal Audit
\n
5.20 Erection Plan
\n <\/td>\n<\/tr>\n
59<\/td>\n5.21 Safety Plan
\n <\/td>\n<\/tr>\n
60<\/td>\n5.22 Other Project-Specific Requirements
\n <\/td>\n<\/tr>\n
61<\/td>\nChapter 6 Hydraulic Metal Structures Fabricator Requirements
\n
6.2 Scope
\n <\/td>\n<\/tr>\n
62<\/td>\n6.3 References
\n
6.5 Management Responsibility
\n <\/td>\n<\/tr>\n
64<\/td>\n6.6 Construction Document Review and Communication
\n
6.7 Detailing
\n <\/td>\n<\/tr>\n
65<\/td>\n6.12 Process Controls
\n <\/td>\n<\/tr>\n
67<\/td>\nChapter 6.A Supplemental Requirements for Fabricators of Advanced Hydraulic Metal Structures
\n
6.A.3 References
6.A.5 Management Responsibility
\n
6.A.12 Process Controls
\n <\/td>\n<\/tr>\n
69<\/td>\nChapter 6.F Supplemental Requirements for Fabricators of Fracture-Critical Members of Hydraulic Metal Structures
\n
6.F.3 References
\n
6.F.5 Management Responsibility
\n
6.F.7 Detailing
\n <\/td>\n<\/tr>\n
70<\/td>\n6.F.10 Purchasing
\n
6.F.11 Material Identification
\n
6.F.12 Process Controls
\n <\/td>\n<\/tr>\n
71<\/td>\n6.F.13 Inspection and Testing
\n
6.F.15 Control of Nonconformances
\n <\/td>\n<\/tr>\n
72<\/td>\nInside back cover
\n <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

AISC 207-20 Standard for Certification Programs<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
AISC<\/b><\/a><\/td>\n2020<\/td>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":407281,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2821],"product_tag":[],"class_list":{"0":"post-407277","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-aisc","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/407277","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/407281"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=407277"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=407277"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=407277"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}