{"id":396109,"date":"2024-10-20T04:22:55","date_gmt":"2024-10-20T04:22:55","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1017-1991\/"},"modified":"2024-10-26T08:09:48","modified_gmt":"2024-10-26T08:09:48","slug":"ieee-1017-1991","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1017-1991\/","title":{"rendered":"IEEE 1017-1991"},"content":{"rendered":"
Revision Standard – Inactive-Withdrawn. Withdrawn Standard. Withdrawn Date: Dec 09, 1997. No longer endorsed by the IEEE. Revision of IEEE Std 1017-1985 Procedures and test-voltage values for acceptance and maintenance testing of electrical submersible pump (ESP) cable systems are presented. This recommended practice applies to cable systems rated 3000 V and 5000 V and is intended only for this special-purpose cable. The intent is to provide uniform test procedures an guidelines for evaluation of the test results.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
7<\/td>\n | 1 Introduction 1.1 Background 1.2 Purpose 1.3 Scope <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 2 References 3 Definitions 3.1 Current 3.2 Voltage 3.3 Electrical Tests 3.4 Cable <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Typical Electric Submersible Pump Installation <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | General Considerations 4.1 Environmental Influences 4.1.1 Temperature 4.1.2 Environmental Conditions Well Liquids and Gases 4.2 Test Equipment DC High Potential Tester (hi-pot) Insulation Resistance Meter Safety of Personnel 4.4 Equipment Setup <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Special Test Equipment Time Domain Reflectometer (TDR) 4.5.2 Thumper Bridge Type Fault Locater 4.5.4 DC Bum 4.6 Equipment Maintenance DC Hi-Pot Test Methods 5.1 Precautions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5.2 Procedures High-Voltage DC Cable Test Connections <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Step Voltage Testing of ESP Cable Test Voltages for ESP Cable <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Evaluation of Results 6.1 Current-Time Relationship 6.2 Interpretation Leakage Current in Good Cable Leakage Current in Bad Cable <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 6.3 Dielectric Failure 6.4 Current Comparison Continuity Tests Mechanical Intergrity <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Field Testing Electric Submersible Pump Cable<\/b><\/p>\n |