{"id":29864,"date":"2024-10-17T03:22:57","date_gmt":"2024-10-17T03:22:57","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-ptc-39-05-2005\/"},"modified":"2024-10-24T14:15:26","modified_gmt":"2024-10-24T14:15:26","slug":"asme-ptc-39-05-2005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-ptc-39-05-2005\/","title":{"rendered":"ASME PTC 39 05 2005"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Figures Forms <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | NOTICE <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | COMMITTEE ROSTER <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | CORRESPONDENCE WITH THE PTC 39 COMMITTEE <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | INTRODUCTION <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Section 1 Object and Scope 1- 1 SCOPE 1- 2 OBJECT 1- 3 UNCERTAINTY ANALYSIS Section 2 Definitions and Descriptions of Terms 2- 1 GENERAL 2- 2 STEAM TRAP 2- 3 CAPACITY OF A STEAM TRAP 2- 4 PRESSURE <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2- 5 INLET SUBCOOLING 2- 6 SUBCOOLED CONDENSATE Section 3 Guiding Principles 3- 1 ITEMS ON WHICH AGREEMENT SHALL BE REACHED 3- 2 QUALIFICATIONS OF PERSON RESPONSIBLE FOR THE TEST 3- 3 DUTIES OF PERSON RESPONSIBLE FOR THE TEST 3- 4 PROCEDURES AND TEST APPARATUS 3- 5 TESTS 3- 6 CALIBRATION OF INSTRUMENTS 3- 7 DATA SOURCES 3- 8 ADJUSTMENTS DURING TEST 3- 9 RECORDS AND TEST RESULTS 3- 10 CALCULATIONS <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Section 4 Instruments and Methods of Measurement 4- 1 GENERAL 4- 2 CALIBRATION OF INSTRUMENTS AND APPARATUS 4- 3 TEMPERATURE 4- 4 PRESSURE 4- 5 FLOW MEASUREMENTS <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4- 6 TIME INTERVALS 4- 7 STEAM LOSS TESTS <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 1 Test Arrangement for Steam Loss Tests <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 1 Data Log for Steam Loss Tests: No Loads or Condensate Load <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4- 8 CONDENSATE CAPACITY TESTS 2 Condensate Capacity Test Arrangement <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 3 Recommended Pressure Connection <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 2 Data Log for Capacity Test: Accumulator Level Measurement <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 3 Calculation of Condensate Capacity <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4 Data Log for Intermittent Flow Capacity Test: Weigh Tank Measurement <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 4- 9 AIR AND NONCONDENSIBLE GAS REMOVAL TESTS 5 Calculation of Condensate Capacity: Weigh Tank Measurement <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 6 Data Log for Intermittent Flow Capacity Test: Flowmeter Measurement <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 4 Air and Noncondensible Gas Handling Capability Test Arrangement 7 Calculation of Condensate Capacity: Flowmeter Measurement <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 8 Data Log for Air and Noncondensible Removal Test <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Section 5 Computation of Results 5- 1 CORRECTION OF MEASURED VARIABLES 5- 2 USE OF FORMULA SYMBOLS 5- 3 STEAM LOSS CALCULATIONS <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Section 6 Report of Test 6- 1 GENERAL INFORMATION 6- 2 DETAILED INFORMATION <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 9 Steam Loss Test Calculations <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Section 7 References <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | MANDATORY APPENDIX I UNCERTAINTY ANALYSIS I- 1 GENERAL I- 2 UNCERTAINTY IN CAPACITY TESTS <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | I- 3 UNCERTAINTY IN STEAM LOSS TESTS <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | I- 4 UNCERTAINTY IN AIR VENTING TESTS <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | NONMANDATORY APPENDIX A CONVERSION TABLES <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ASME PTC 39 Steam Traps <\/b><\/p>\n |