{"id":243979,"date":"2024-10-19T16:01:12","date_gmt":"2024-10-19T16:01:12","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-61326-2-42013\/"},"modified":"2024-10-25T10:59:09","modified_gmt":"2024-10-25T10:59:09","slug":"bs-en-61326-2-42013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-61326-2-42013\/","title":{"rendered":"BS EN 61326-2-4:2013"},"content":{"rendered":"
IEC 61236-2-4:2012 specifies detailed test configurations, operational conditions and performance criteria for equipment for insulation monitoring according to IEC 61557-8 and insulation fault location according to IEC 61557-9. This applies to insulation monitoring devices and insulation fault location systems permanently or semi-permanently connected to the distribution system. This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. It includes the following significant technical change: update of the document with respect to IEC 61326-1:2012. This publication is to be read in conjunction with \/2.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | Annex ZZ (informative) Coverage of Essential Requirements of EU Directives <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | English CONTENTS <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 4 General 5 EMC test plan 5.1 General <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 5.2 Configuration of EUT during testing 5.2.1 General 5.2.2 Composition of EUT 5.2.3 Assembly of EUT 5.2.4 I\/O ports 5.2.5 Auxiliary equipment 5.2.6 Cabling and earthing (grounding) 5.3 Operation conditions of EUT during testing 5.3.101 Operational conditions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.4 Specification of functional performance 5.5 Test description 6 Immunity requirements 6.1 Conditions during the tests 6.1.101 Electrostatic discharge immunity tests <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 6.1.102 Electromagnetic field tests 6.1.103 Burst tests 6.1.104 Surge immunity tests 6.1.105 Conducted RF tests 6.1.106 Power frequency magnetic field tests 6.2 Immunity test requirements <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 6.3 Random aspects 6.4 Performance criteria Table 101 \u2013 Immunity tests <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Table 102 \u2013 Performance criteria definition <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 7 Emission requirements 7.1 Conditions during measurements. 7.2 Emission limits 8 Test results and test report Table 103 \u2013 Test conditions for quiescent and operate modes <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 9 Instructions for use <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Annex A (normative) Immunity test requirements for portable test and measurementequipment powered by battery or from the circuit being measured <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Electrical equipment for measurement, control and laboratory use. EMC requirements – Particular requirements. Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9<\/b><\/p>\n |