{"id":239037,"date":"2024-10-19T15:37:43","date_gmt":"2024-10-19T15:37:43","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-623882013\/"},"modified":"2024-10-25T10:19:27","modified_gmt":"2024-10-25T10:19:27","slug":"bs-en-623882013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-623882013\/","title":{"rendered":"BS EN 62388:2013"},"content":{"rendered":"

IEC 62388:2013 specifies the minimum operational and performance requirements, methods of testing and required test results conforming to performance standards not inferior to those adopted by the IMO in Resolution MSC.192(79). (MSC.192\/2) The radar installation, in addition to meeting the general requirements as set out in resolution A.694(17) and the related standard IEC 60945, should comply with the performance standards of MSC.192(79). When a requirement of this standard is different from IEC 60945, the requirement in this standard takes precedence. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision. The contents of the corrigendum of February 2014 have been included in this copy.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nForeword <\/td>\n<\/tr>\n
5<\/td>\nEndorsement notice <\/td>\n<\/tr>\n
6<\/td>\nAnnex ZA (normative) Normative references to international publications with their corresponding European publications <\/td>\n<\/tr>\n
8<\/td>\nCONTENTS <\/td>\n<\/tr>\n
17<\/td>\n1 Scope
2 Normative references <\/td>\n<\/tr>\n
18<\/td>\n3 Terms and definitions <\/td>\n<\/tr>\n
30<\/td>\n4 General
4.1 Overview <\/td>\n<\/tr>\n
31<\/td>\n4.2 Purpose
4.3 Application of these standards
4.4 Equipment categories <\/td>\n<\/tr>\n
32<\/td>\n4.5 Establishing equipment type and status
Tables
Table 1 \u2013 Performance requirements for categories of ship\/craft for SOLAS V <\/td>\n<\/tr>\n
33<\/td>\n4.6 Conditions of measurement and related definitions
4.7 Quality requirements
5 Tests
5.1 Test sites and simulation
5.1.1 Environmental and RF testing
5.1.2 Over-sea radar performance tests <\/td>\n<\/tr>\n
34<\/td>\n5.1.3 Test targets and target simulation for performance tests
5.2 Test terminology and format
5.2.1 General
5.2.2 Test requirement terminology <\/td>\n<\/tr>\n
35<\/td>\n5.2.3 Testing method terminology
6 Radar performance
6.1 General
6.2 Transmission and interference
6.2.1 Transmission frequency <\/td>\n<\/tr>\n
36<\/td>\n6.2.2 Interference
6.3 Performance optimisation and monitoring
6.3.1 General
6.3.2 Optimum performance <\/td>\n<\/tr>\n
37<\/td>\n6.4 Gain and anti-clutter functions
6.4.1 General
6.4.2 Gain function
6.4.3 Manual and automatic sea anti-clutter <\/td>\n<\/tr>\n
38<\/td>\n6.4.4 Rain anti-clutter
6.5 Signal processing
6.5.1 General
6.5.2 Target enhancement <\/td>\n<\/tr>\n
39<\/td>\n6.5.3 Radar signal correlation
6.5.4 Signal processing and radar image latency
6.5.5 Second-time-around echoes <\/td>\n<\/tr>\n
40<\/td>\n6.5.6 Transmission format
6.5.7 Picture update
6.5.8 Additional processing
6.5.9 Signal processing description <\/td>\n<\/tr>\n
41<\/td>\n6.6 Operation with SARTs, target enhancers (RTEs) and beacons
6.6.1 General
6.6.2 Radar beacons, SARTs and enhancers
6.7 Minimum range and range compensation
6.7.1 General <\/td>\n<\/tr>\n
42<\/td>\n6.7.2 Range compensation
6.7.3 Minimum range <\/td>\n<\/tr>\n
43<\/td>\n6.8 Range and bearing discrimination
6.8.1 General
6.8.2 Measurement conditions
6.8.3 Range discrimination
6.8.4 Bearing discrimination <\/td>\n<\/tr>\n
44<\/td>\n6.8.5 Fundamental radar accuracy
6.9 Target detection performance assessment
6.9.1 General <\/td>\n<\/tr>\n
45<\/td>\n6.9.2 Range of first detection in minimal clutter
Table 2 \u2013 Range of first detection in clutter-free conditions <\/td>\n<\/tr>\n
48<\/td>\nFigures
Figure 1 \u2013 Reduction of range to first detection due to rain at S-band
Figure 2 \u2013 Reduction of range to first detection due to rain at X-band <\/td>\n<\/tr>\n
51<\/td>\nTable 3 \u2013 X-band pass\/fail assessment criteria
Table 4 \u2013 S-band pass\/fail assessment criteria <\/td>\n<\/tr>\n
52<\/td>\nTable 5 \u2013 Pass\/fail assessment
Table 6 \u2013 Douglas sea state parameters <\/td>\n<\/tr>\n
54<\/td>\nTable 7 \u2013 Main horizontal beam pattern <\/td>\n<\/tr>\n
55<\/td>\nTable 8 \u2013 Effective side-lobes <\/td>\n<\/tr>\n
56<\/td>\n7 Display presentation
7.1 General
7.1.1 Requirements
7.1.2 Methods of test and required results
7.2 Linearity and index delay
7.2.1 Requirements
7.2.2 Methods of test and required results
7.3 Use and discrimination of colour
7.3.1 Requirements
7.3.2 Methods of test and required results <\/td>\n<\/tr>\n
57<\/td>\n8 CCRP and own ship
8.1 Consistent common reference point (CCRP)
8.1.1 CCRP
8.1.2 CCRP position
8.1.3 Measurements <\/td>\n<\/tr>\n
58<\/td>\n8.1.4 Antenna offset
8.2 Own ship
8.2.1 General
8.2.2 Own ship\u2019s outline and minimised symbol
8.2.3 Heading line <\/td>\n<\/tr>\n
59<\/td>\n8.2.4 Stern line
9 Navigation tools
9.1 General
9.2 Units of measurement
9.2.1 Requirements <\/td>\n<\/tr>\n
60<\/td>\n9.2.2 Methods of test and required results
9.3 Presentation
9.3.1 Requirements
9.3.2 Methods of test and required results
9.4 Display range scales
9.4.1 Mandatory range scales <\/td>\n<\/tr>\n
61<\/td>\n9.5 Variable range marker (VRM)
9.5.1 General
9.5.2 VRM measurements <\/td>\n<\/tr>\n
62<\/td>\n9.6 Electronic bearing line (EBL)
9.6.1 General
9.6.2 EBL measurements <\/td>\n<\/tr>\n
63<\/td>\n9.6.3 EBL origin position
9.7 Cursor
9.7.1 General
9.7.2 Cursor measurement <\/td>\n<\/tr>\n
64<\/td>\n9.7.3 Selection by cursor
9.8 Offset measurement of range and bearing
9.8.1 General
9.8.2 Electronic range and bearing line (ERBL) <\/td>\n<\/tr>\n
65<\/td>\n9.9 Parallel index lines (PI)
9.9.1 General
9.9.2 PI lines and positioning <\/td>\n<\/tr>\n
66<\/td>\n9.10 Bearing scale
9.10.1 General
9.10.2 Bearing scale presentation <\/td>\n<\/tr>\n
67<\/td>\n9.11 Range rings
9.11.1 General
9.11.2 Range ring presentation and measurement <\/td>\n<\/tr>\n
68<\/td>\n9.12 Radar maps
9.12.1 General
9.12.2 Map functions and display simple user-defined maps
9.12.3 Map memory and transfer <\/td>\n<\/tr>\n
69<\/td>\n9.12.4 Map presentation properties
Table 9 \u2013 Features and colours to be used for radar maps <\/td>\n<\/tr>\n
70<\/td>\n10 Orientation, motion and stabilisation
10.1 General
10.2 Azimuth orientation
10.2.1 Accuracy of alignment <\/td>\n<\/tr>\n
71<\/td>\n10.2.2 Heading readout and reference <\/td>\n<\/tr>\n
72<\/td>\n10.2.3 Azimuth stabilisation update
10.3 Motion and orientation modes
10.3.1 General
10.3.2 True and relative motion <\/td>\n<\/tr>\n
73<\/td>\n10.4 Off-centring
10.4.1 General
10.4.2 Manual and automatic off-centring
10.4.3 Automatic reset <\/td>\n<\/tr>\n
74<\/td>\n10.4.4 Display orientation <\/td>\n<\/tr>\n
75<\/td>\n10.5 Ground and sea stabilisation
10.5.1 Mode and source
10.5.2 Ground stabilisation <\/td>\n<\/tr>\n
76<\/td>\n10.5.3 Sea stabilisation
11 Aids for collision avoidance
11.1 General
11.2 Target trails and past positions
11.2.1 General <\/td>\n<\/tr>\n
77<\/td>\n11.2.2 Time and plot requirements
11.2.3 Trails\/past position availability <\/td>\n<\/tr>\n
78<\/td>\n11.3 Target tracking (TT)
11.3.1 General
11.3.2 Presentation of targets <\/td>\n<\/tr>\n
79<\/td>\n11.3.3 Tracking calculations
11.3.4 Target tracking availability <\/td>\n<\/tr>\n
80<\/td>\n11.3.5 Classification and tracked target capacity
Table 10 \u2013 Tracked target capacity (subset of Table 1) <\/td>\n<\/tr>\n
83<\/td>\nTable 11 \u2013 Typical tracked target accuracy (95\u00a0% probability figures) <\/td>\n<\/tr>\n
84<\/td>\nTable 12 \u2013 TT scenario 1, with sensor errors applied
Table 13 \u2013 TT scenario 1, times of measurement task <\/td>\n<\/tr>\n
85<\/td>\nFigure 3 \u2013 TT scenario 1
Table 14 \u2013 TT scenario 1, accuracies after 1 min and 3 min (all \u00b1 values) <\/td>\n<\/tr>\n
86<\/td>\nFigure 4 \u2013 TT scenario 2
Table 15 \u2013 TT scenario 2, own ship turning through \u00b1 180\u00b0 <\/td>\n<\/tr>\n
87<\/td>\nFigure 5 \u2013 TT scenario 3
Table 16 \u2013 TT scenario 3, initial target data
Table 17 \u2013 TT scenario 4, initial target data for fast targets (standard speed ships) <\/td>\n<\/tr>\n
88<\/td>\nFigure 6 \u2013 TT scenario 4
Table 18 \u2013 TT scenario 4, initial target data for fast targets (HSC) <\/td>\n<\/tr>\n
89<\/td>\nFigure 7 \u2013 TT scenario 5
Table 19 \u2013 TT scenario 5: initial target data for standard craft
Table 20 \u2013 TT scenario 5: initial target data for collision scenario for HSC <\/td>\n<\/tr>\n
90<\/td>\nTable 21 \u2013 Measurement points and results at 3 min and 6 min for HSC
Table 22 \u2013 Measurement points and results at 11 min and 14 min for HSC
Table 23 \u2013 Measurement points and results at 3 min and 6 min for standard craft <\/td>\n<\/tr>\n
91<\/td>\nTable 24 \u2013 Measurement points and results at 11 min and 14 min for standard craft
Table 25 \u2013 Measurement of tracked target accuracy <\/td>\n<\/tr>\n
94<\/td>\nTable 26 \u2013 AIS display capacity (subset of Table 1) <\/td>\n<\/tr>\n
101<\/td>\nTable 27 \u2013 AIS reporting rates <\/td>\n<\/tr>\n
103<\/td>\nTable 28 \u2013 Association scenario 1, initial TT and AIS target position and data <\/td>\n<\/tr>\n
104<\/td>\nTable 29 \u2013 Association scenario 1, AIS target data for diverging and converging tracks
Table 30 \u2013 Association scenario 2, initial TT and AIS target position and data <\/td>\n<\/tr>\n
105<\/td>\nTable 31 \u2013 Association scenario 2, AIS target data for changing speed
Table 32 \u2013 Association scenario 3, TT and AIS target start position and data <\/td>\n<\/tr>\n
106<\/td>\nTable 33 \u2013 Association scenario 4, initial TT and AIS target position and data
Table 34 \u2013 Association scenario 4, TT and AIS target with the same course and speed <\/td>\n<\/tr>\n
107<\/td>\n12 Chart radar (optional classification)
12.1 General requirements
12.1.1 General
12.1.2 Chart operation and source <\/td>\n<\/tr>\n
108<\/td>\n12.1.3 Chart elements and availability <\/td>\n<\/tr>\n
109<\/td>\n12.1.4 Chart reference
12.1.5 Primary chart information set <\/td>\n<\/tr>\n
110<\/td>\n12.1.6 Chart stabilisation and chart redraw <\/td>\n<\/tr>\n
111<\/td>\n12.1.7 Chart position and latency
12.1.8 Matching and adjustment <\/td>\n<\/tr>\n
112<\/td>\n12.1.9 Chart symbols, colours, and size <\/td>\n<\/tr>\n
113<\/td>\n12.1.10 Chart display size
12.1.11 Chart alerts and indications <\/td>\n<\/tr>\n
114<\/td>\n12.1.12 Chart malfunction
12.1.13 Chart radar malfunction
12.2 Additional requirements for standalone radar with chart facilities
12.2.1 General
12.2.2 Provision and updating of chart information <\/td>\n<\/tr>\n
115<\/td>\n12.2.3 Content and structure of chart data
12.3 Additional requirements for ECDIS back-up (optional)
12.3.1 General
12.3.2 Requirements
12.3.3 Test Methods and required results
13 Ergonomic criteria (control functions and display)
13.1 General
13.2 Operational controls <\/td>\n<\/tr>\n
116<\/td>\n13.3 Primary controls <\/td>\n<\/tr>\n
117<\/td>\n13.4 Control properties
13.5 Default control setting and saved user control settings <\/td>\n<\/tr>\n
118<\/td>\nTable 35 \u2013 Control settings configured in response to \u2018Default\u2019 selection <\/td>\n<\/tr>\n
119<\/td>\n14 Interfacing
14.1 General
14.2 Input interfacing
14.2.1 Input data <\/td>\n<\/tr>\n
120<\/td>\n14.2.2 Input quality, integrity and latency
14.3 Output interfacing
14.3.1 Output format
14.3.2 Output target data <\/td>\n<\/tr>\n
121<\/td>\n14.3.3 VDR interface <\/td>\n<\/tr>\n
122<\/td>\n15 Design, servicing and installation
15.1 General
15.2 Fault diagnosis and servicing
15.2.1 Requirements <\/td>\n<\/tr>\n
123<\/td>\n15.2.2 Methods of test and required results
15.3 Display design
15.3.1 Requirements
15.3.2 Methods of test and required results
15.4 Transceiver design
15.4.1 General <\/td>\n<\/tr>\n
124<\/td>\n15.4.2 Sector blanking
15.5 Antenna design
15.5.1 Requirements
15.5.2 Methods of test and required results <\/td>\n<\/tr>\n
125<\/td>\n15.6 Inter-switched and multiple radars
15.6.1 General
15.6.2 System safeguards
15.6.3 Combining radar <\/td>\n<\/tr>\n
126<\/td>\n15.6.4 Multiple radar system status
15.7 Multiple operational displays
15.7.1 Additional information and conformity
15.7.2 Requirements <\/td>\n<\/tr>\n
127<\/td>\n15.8 Safety \u2013 antenna and radiation
15.8.1 General
15.8.2 Antenna radiation and rotation
15.8.3 Microwave radiation levels <\/td>\n<\/tr>\n
128<\/td>\n16 Alerts and failures
16.1 General
16.1.1 Priority of alerts
16.1.2 Alerts and indications
16.1.3 Alarm contact outputs
16.1.4 Alert management interface <\/td>\n<\/tr>\n
129<\/td>\n16.1.5 Unacknowledged warnings <\/td>\n<\/tr>\n
130<\/td>\n16.1.6 Unacknowledged alarms
16.1.7 Remote acknowledgement and silencing of alerts <\/td>\n<\/tr>\n
131<\/td>\n16.1.8 Picture freeze
16.1.9 Sensor failure alert
16.2 Backup and fallback arrangements
16.2.1 Requirements
16.2.2 Failure of heading information (azimuth stabilisation) <\/td>\n<\/tr>\n
132<\/td>\n16.2.3 Failure of speed through the water information
16.2.4 Failure of course and speed over ground information
16.2.5 Failure of position input information <\/td>\n<\/tr>\n
133<\/td>\n16.2.6 Failure of radar video input information
16.2.7 Failure of AIS input information
16.2.8 Failure of an integrated or networked system
17 Environmental testing
17.1 General <\/td>\n<\/tr>\n
134<\/td>\n17.2 Testing to IEC\u00a060945
17.2.1 Requirements
17.2.2 Methods of test and required results
17.3 Additional environmental tests
17.3.1 General <\/td>\n<\/tr>\n
135<\/td>\n17.3.2 Antenna shock test
18 Equipment familiarisation and documentation
18.1 Familiarisation simulator
18.1.1 General
18.1.2 Requirements
18.1.3 Methods of test and required results
Table 36 \u2013 Antenna shock test severity (half sine pulse) <\/td>\n<\/tr>\n
136<\/td>\n18.2 Instructions and documentation
18.2.1 General
18.2.2 Documentation
18.2.3 Operating instructions <\/td>\n<\/tr>\n
137<\/td>\n18.3 Radar system installation
18.3.1 Requirements
18.3.2 Methods of test and required results <\/td>\n<\/tr>\n
138<\/td>\n18.4 Maintenance information for equipment update
18.4.1 Requirements
18.4.2 Methods of test and required results <\/td>\n<\/tr>\n
139<\/td>\nAnnex A (informative) Guidelines for radar functionality on navigation displays <\/td>\n<\/tr>\n
140<\/td>\nAnnex B (normative) Unwanted emissions of radar systems <\/td>\n<\/tr>\n
141<\/td>\nTable B.1 \u2013 Measurement frequency ranges <\/td>\n<\/tr>\n
143<\/td>\nFigure B.1 \u2013 B\u201340 falls within the allocated band <\/td>\n<\/tr>\n
144<\/td>\nFigure B.2 \u2013 B\u201340 falls outside the allocated band <\/td>\n<\/tr>\n
145<\/td>\nAnnex C (informative) Radar target size (RCS) and detection range calculations <\/td>\n<\/tr>\n
148<\/td>\nFigure C.1 \u2013 Enhancement by reflection (dB) over free-space (9,41 GHz)
Figure C.2 \u2013 Enhancement by reflection (dB) over free-space (3,05 GHz) <\/td>\n<\/tr>\n
149<\/td>\nAnnex D (informative) Factors that influence target detection <\/td>\n<\/tr>\n
150<\/td>\nTable D.1 \u2013 Spread of RCS values for typical ships <\/td>\n<\/tr>\n
151<\/td>\nFigure D.1 \u2013 Effect of sea spikes on target detection <\/td>\n<\/tr>\n
152<\/td>\nTable D.2 \u2013 S-band performance predictions for ranges of 0,2, 0,4, 0,7 NM
Table D.3 \u2013 X-band performance predictions for ranges of 0,2, 0,7 NM <\/td>\n<\/tr>\n
153<\/td>\nFigure D.2 \u2013 Multi-path plots for S-band
Figure D.3 \u2013 Multi-path plot for X-band <\/td>\n<\/tr>\n
154<\/td>\nTable D.4 \u2013 Parameters for attenuation in uniform rain conditions
Table D.5 \u2013 Typical values for attenuation and backscatter in uniform rain conditions
Table D.6 \u2013 Additional radar system parameters (X\/S-band) <\/td>\n<\/tr>\n
155<\/td>\nTable D.7 \u2013 Target size, height and RCS values <\/td>\n<\/tr>\n
156<\/td>\nTable D.8 \u2013 S-band radar parameters (LP) <\/td>\n<\/tr>\n
157<\/td>\nTable D.9 \u2013 X-band radar parameters (LP) <\/td>\n<\/tr>\n
158<\/td>\nAnnex E (normative) Sensor errors <\/td>\n<\/tr>\n
160<\/td>\nAnnex F (informative) Target scenario simulator\/reported target simulator <\/td>\n<\/tr>\n
161<\/td>\nAnnex G (informative) Tracked and reported target states
Figure G.1 \u2013 Tracked target states
Figure G.2 \u2013 AIS target state <\/td>\n<\/tr>\n
162<\/td>\nAnnex H (normative) IEC 61162 sentence formats
Table H.1 \u2013 Mandatory IEC\u00a061162-1 sentences <\/td>\n<\/tr>\n
163<\/td>\nTable H.2 \u2013 Optional IEC\u00a061162-3 messages <\/td>\n<\/tr>\n
164<\/td>\nTable H.3 \u2013 Description of terms <\/td>\n<\/tr>\n
165<\/td>\nTable H.4 \u2013 Header format (1 of 2) <\/td>\n<\/tr>\n
167<\/td>\nTable H.5 \u2013 Package data format <\/td>\n<\/tr>\n
171<\/td>\nAnnex I (normative) Radar control function\/indication grouping
Table I.1 \u2013 Top-level grouping of data and control functions for radar applications <\/td>\n<\/tr>\n
172<\/td>\nTable I.2 \u2013 Icons for common function controls (1 of 2) <\/td>\n<\/tr>\n
175<\/td>\nAnnex J (informative) Interference to shipborne radar fromemissions in adjacent frequency bands <\/td>\n<\/tr>\n
178<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Maritime navigation and radiocommunication equipment and systems. Shipborne radar. Performance requirements, methods of testing and required test results<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2014<\/td>\n180<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":239044,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-239037","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/239037","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/239044"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=239037"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=239037"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=239037"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}