{"id":223857,"date":"2024-10-19T14:32:27","date_gmt":"2024-10-19T14:32:27","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-10845-12010\/"},"modified":"2024-10-25T08:16:20","modified_gmt":"2024-10-25T08:16:20","slug":"bs-iso-10845-12010","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-10845-12010\/","title":{"rendered":"BS ISO 10845-1:2010"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 30184057 cover <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | 30230553-VOR <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Scope Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Terms and definitions <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Establishing a procurement system General Developing and documenting the system <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Responding to decisions taken Conduct of employees, agents and contractors Code of conduct <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.2.2 Disciplinary action Procurement policy <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Secondary procurement policy General requirements Minimum requirements Contract-specific goals <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Break-out procurement Requirements relating to the granting of evaluation points General Evaluating contract-specific goals <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Formulating contract-specific goals Requirements relating to accelerated rotations in electronic Rotating electronic databases Operating principles <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Software requirements Minimum requirements <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Publicly accessible information Conduct of those admitted to the database <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 4.6 Means of communication 4.7 Devices relating to the electronic receipt of submission Preparing for procurement Preparation for a procurement other than a disposal Initial considerations <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Readiness to solicit tender offers Records Preparation for a disposal Initial considerations <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Readiness to proceed Records Procurement methods and procedures General <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Procurement documentation General requirements Basic terms and conditions Submission data <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Tender data Eligibility criteria Evaluation criteria <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Scope of work Cost reimbursement and cost plus contracts Delivery periods <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Preferencing Quality General Evaluation of quality in tender submissions General <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Formulation of quality criteria <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Scoring of quality <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Solicitation of tender offers General Basic procedures Reduction of time frames Competitive selection procedures General <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Nominated procedure Open procedure Qualified procedure <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Quotation procedure Proposal procedure using the two-envelope system Proposal procedure using the two-stage tendering system <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Shopping procedure Negotiated procedure Competitive negotiation procedures <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Disposal procedures Electronic auction procedure General <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Procurement documentation Procedures <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Framework agreements <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Advertisements General Mininum information to be conveyed in advertisements for ten Minimum information to be conveyed in advertisements for exp Tender process and procedures General <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Tender deposits Contacting of tenderers before the close of tenders Receipt of tender submissions Return of unopened submissions <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Opening of tender submissions Evaluation of tender submissions Disqualification of tenderers Test for responsiveness <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Test for capability and capacity to perform the contract Arithmetical errors and omissions Ranking and scoring of responsive tenderers Evaluation panel <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Procedures <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Abnormally low tenders <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Risk assessment Tender-evaluation report <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Award of contracts General Records <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Notification of unsuccessful tenderers Contract administration Resolution of disputes arising from a contract <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Unsolicited proposals Departures from established methods and procedures <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | 30184057 National Annex <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Construction procurement – Processes, methods and procedures<\/b><\/p>\n |