{"id":160791,"date":"2024-10-19T09:39:31","date_gmt":"2024-10-19T09:39:31","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-347-2r-05-2005\/"},"modified":"2024-10-25T01:58:10","modified_gmt":"2024-10-25T01:58:10","slug":"aci-347-2r-05-2005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-347-2r-05-2005\/","title":{"rendered":"ACI 347.2R 05 2005"},"content":{"rendered":"
This guide presents information and design criteria for shoring\/reshoring operations during the construction of reinforced and post-tensioned multi-story buildings. It provides methods for developing safe construction schedules and provides design examples. It is written for the use of form-work engineer\/contractors and engineer\/architects. Keywords: construction loads; falsework; form removal, formwork; post-tensioning; reshoring; shoring.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | CHAPTER 1\u2014 INTRODUCTION CHAPTER 2\u2014 SHORING\/RESHORING CONSTRUCTION NEEDS 2.1\u2014Definitions <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | 2.2\u2014Advantages of reshoring 2.3\u2014Types of forming systems CHAPTER 3\u2014 CONSTRUCTION LOADS ON FORMWORK 3.1\u2014Construction loads <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | 3.1.1 Gravity loads 3.1.2 Lateral loads 3.1.3 Other loads and conditions 3.1.4 Post-Tensioning load distribution 3.2\u2014Load combinations 3.3\u2014Typical phases of construction <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 3.4\u2014Construction load distribution <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 3.5\u2014Application of the simplified method 3.6\u2014Factors affecting the construction load distribution 3.6.1 Shore\/reshore stiffness <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 3.6.2 Floor stiffness and type 3.6.3 Shore system configuration 3.6.4 Number of shored levels 3.6.5 Number of reshored levels 3.6.6 Rate of construction 3.7\u2014Post-tensioning load redistribution <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | CHAPTER 4\u2014 STRENGTH ADEQUACY OF CONCRETE SLABS AND FORMWORK 4.1\u2014Early-age concrete material strength development 4.1.1 Compressive strength 4.1.2 Tensile strength 4.1.3 Modulus of elasticity <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 4.2\u2014Construction load factors 4.3\u2014Early-age capacity of concrete slabs 4.3.1 Flexural strength 4.3.2 Shear strength <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4.4\u2014Serviceability requirements 4.5\u2014Formwork adequacy CHAPTER 5\u2014 CONSTRUCTION EXAMPLES 5.1\u2014 Two- way slab construction 5.1.1 Construction example data <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.1.2 Construction load distribution <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5.1.3 Concrete strength development 5.1.4 Adequacy of concrete slabs 5.1.4.1 Available early-age slab load capacity <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.1.4.2 Applied construction load 5.1.4.3 Strength adequacy 5.1.4.4 Slab deflections 5.1.5 Adequacy of shoring\/reshoring system <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.2\u2014Post-tensioned construction example 5.2.1 Post-tensioned example data 5.2.1.1 Member sizes 5.2.1.2 Design loads 5.2.1.3 Concrete mixtures 5.2.1.4 Shoring system 5.2.1.5 Construction loads 5.2.1.6 Construction weather conditions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.2.1.7 Construction rate 5.2.1.8 Post-tensioning sequence 5.2.2 Construction load distribution 5.2.2.1 Concrete placement stage 5.2.2.2 Post-tensioning stage 5.2.2.3 Post-tensioning of slabs 5.2.2.4 Post-tensioning of beams <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.2.2.5 Post-tensioning of girders 5.2.3 Adequacy of concrete members <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.2.4 Adequacy of shoring\/reshoring system 5.2.4.1 Slab shores 5.2.4.2 Beam shores 5.2.4.3 Girder shores CHAPTER 6\u2014 REFERENCES 6.1\u2014 Referenced standards and reports <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.2\u2014Cited references <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" 347.2R-05: Guide for Shoring\/Reshoring of Concrete Multistory Buildings<\/b><\/p>\n |