{"id":160680,"date":"2024-10-19T09:39:09","date_gmt":"2024-10-19T09:39:09","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-305-1m-14\/"},"modified":"2024-10-25T01:57:47","modified_gmt":"2024-10-25T01:57:47","slug":"aci-305-1m-14","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-305-1m-14\/","title":{"rendered":"ACI 305.1M 14"},"content":{"rendered":"
The official version of this ACI document uses inch-pound units. A conversion of an ACI document into SI units is for the convenience of users. Care has been taken to ensure that the conversion is correct; however, ACI does not guarantee its accuracy. Official interpretation of this ACI document shall be based only on the U.S. customary units. This reference specification provides requirements for hot weather concreting that the architect\/engineer can apply to any construction project involving hot weather concreting by citing it in the project specification. Checklists are provided to assist the architect\/engineer in supplementing the provisions of this reference specification as needed by designating or specifying customized project requirements. This specification includes hot weather requirements for production preparations, delivery, placement, finishing, bleed-water evaporation, curing, and concrete protection. Provisions governing a preplacement conference, concrete mixture proportions, maximum allowable concrete temperature, rate of surface evaporation measurements, evaporation control measures, and acceptance of a concrete mixture from past field experience or preconstruction testing are also included. The materials, processes, quality control measures, and inspections described in this document should be tested, monitored, or performed as applicable only by individuals holding the appropriate ACI Certifications or equivalent. Keywords: bleeding; curing; evaporation; finishing; mixture proportioning; plastic shrinkage cracking; protection period; trial batch.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | SECTION 1\u2014GENERAL 1.1\u2014Scope 1.2\u2013\u2013Definitions 1.3\u2014Reference Standards 1.4\u2014Submittals <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 1.5\u2013\u2013Quality assurance, quality control, and acceptance of work SECTION 2\u2014PRODUCTS 2.1\u2014General SECTION 3\u2014EXECUTION 3.1\u2014General 3.2\u2014Maximum temperature of fresh concrete at time of discharge 3.3\u2014Qualification of concrete mixture <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 3.4\u2014Concrete production and delivery 3.5\u2014Concrete placement and finishing 3.6\u2014Concrete bleed-water evaporation 3.7\u2014Concrete curing 3.8\u2014Concrete protection NOTES TO SPECIFIER General notes <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword to checklists <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | APPENDIX A\u2013\u2013EXAMPLE OF UNO EQUATION USED TO DETERMINE SURFACE EVAPORATION RATE OF FRESH CONCRETE Example: Uno equation APPENDIX B\u2013\u2013EXAMPLE OF NRMCA NOMOGRAPH FOR ESTIMATING SURFACE EVAPORATION RATE ON THE BASIS OF MENZEL FORMULA <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" 305.1M-14 Specification for Hot Weather Concreting<\/b><\/p>\n |