{"id":15969,"date":"2024-10-16T22:00:42","date_gmt":"2024-10-16T22:00:42","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-std-c57-12-00-2006\/"},"modified":"2024-10-24T12:16:38","modified_gmt":"2024-10-24T12:16:38","slug":"ieee-std-c57-12-00-2006","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-std-c57-12-00-2006\/","title":{"rendered":"IEEE STD C57.12.00 2006"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Standard for Standard General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers IEEE Standard for Standard General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page Title page <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Introduction Introduction <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Notice to users Notice to users <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Participants Participants <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | CONTENTS CONTENTS <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 1. Overview 1. Overview 1.1 Scope 1.1 Scope 1.2 Word usage 1.2 Word usage <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 2. Normative references 2. Normative references <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 3. Definitions 3. Definitions 4. Service conditions 4. Service conditions 4.1 Usual service conditions 4.1 Usual service conditions <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.2 Loading at other-than-rated conditions 4.2 Loading at other-than-rated conditions 4.3 Unusual service conditions 4.3 Unusual service conditions <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5. Rating data 5. Rating data 5.1 Cooling classes of transformers 5.1 Cooling classes of transformers <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.2 Frequency 5.2 Frequency 5.3 Phases 5.3 Phases <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.4 Rated kilovoltamperes 5.4 Rated kilovoltamperes <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.5 Voltage ratings and taps 5.5 Voltage ratings and taps <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5.6 Connections 5.6 Connections 5.7 Polarity, angular displacement, and terminal marking 5.7 Polarity, angular displacement, and terminal marking <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5.8 Impedance 5.8 Impedance 5.9 Total losses 5.9 Total losses <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.10 Insulation levels 5.10 Insulation levels <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.11 Temperature rise and loading conditions 5.11 Temperature rise and loading conditions <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 5.12 Nameplates 5.12 Nameplates <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 6. Construction 6. Construction 6.1 Bushings 6.1 Bushings <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 6.2 Transformer accessories 6.2 Transformer accessories 6.3 Bushing current transformers 6.3 Bushing current transformers <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 6.4 Thermometer wells 6.4 Thermometer wells 6.5 Tank pressure requirments 6.5 Tank pressure requirments <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 6.6 Liquid insulation system 6.6 Liquid insulation system 6.7 Grounding 6.7 Grounding <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 6.8 Minimum external clearances between transformer live parts of different phases of the same voltage 6.8 Minimum external clearances between transformer live parts of different phases of the same voltage <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 7. Short-circuit characteristics 7. Short-circuit characteristics 7.1 Requirements 7.1 Requirements <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 7.2 Components 7.2 Components <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 7.3 Base kilovoltamperes 7.3 Base kilovoltamperes <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 7.4 Calculation of winding temperature during a short circuit 7.4 Calculation of winding temperature during a short circuit <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 8. Testing and calculations 8. Testing and calculations 8.1 General 8.1 General 8.2 Routine, design, and other tests for transformers 8.2 Routine, design, and other tests for transformers <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | 8.3 Additional routine tests on transformers with load tap changing or regulating transformers 8.3 Additional routine tests on transformers with load tap changing or regulating transformers <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | 8.4 Determination of transformer regulation 8.4 Determination of transformer regulation <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | 8.5 Determination of thermal duplicate temperature-rise data 8.5 Determination of thermal duplicate temperature-rise data 8.6 Certified test data 8.6 Certified test data <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 9. Tolerances 9. Tolerances 9.1 Tolerances for ratio 9.1 Tolerances for ratio 9.2 Tolerances for impedance 9.2 Tolerances for impedance 9.3 Tolerances for losses 9.3 Tolerances for losses <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | 9.4 Accuracies required for measuring losses 9.4 Accuracies required for measuring losses 10. Connection of transformers for shipment 10. Connection of transformers for shipment <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Annex A (informative) Bibliography Annex A (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Standard for Standard General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers<\/b><\/p>\n |