{"id":111719,"date":"2024-10-18T16:15:32","date_gmt":"2024-10-18T16:15:32","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c57-113-2010\/"},"modified":"2024-10-24T22:02:28","modified_gmt":"2024-10-24T22:02:28","slug":"ieee-c57-113-2010","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c57-113-2010\/","title":{"rendered":"IEEE C57.113 2010"},"content":{"rendered":"
Revision Standard – Active. Wideband measurement of the apparent charge of partial discharges (PDs) that may occur in liquid-filled power transformers and shunt reactors excited by ac test voltages between 40 Hz and 400 Hz are discussed. The major components of the PD measuring circuit including the calibrator are specified in compliance with IEC 60270. The PD test procedure is described and recommendations for the evaluation of PD test results are presented.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std C57.113-2010 (Revision of IEEE Std C57.113-1991) Front cover \n <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page \n <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Introduction Notice to users Laws and regulations Copyrights <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Updating of IEEE documents Errata Interpretations Patents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Important notice \n 1. Overview 1.1 Scope 1.2 Purpose <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 2. Normative references 3. Definitions <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4. Specification of PD measuring circuits 4.1 General <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4.2 Coupling capacitor <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.3 Measuring impedance 4.4 PD measuring instrument <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.5 PD calibrator <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.6 Maintaining the specified parameters of PD measuring circuits 5. PD test procedure 5.1 Calibration <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.2 PD measurement <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Annex A (informative) \nDesign of PD coupling units A.1 Conventional coupling mode <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | A.2 Bushing tap coupling mode <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex B (informative) \nResponse of PD measuring instruments B.1 Frequency response B.2 Pulse train response <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Annex C (informative) \nCalibration of PD measuring circuits <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Annex D (informative) \nBasic sensitivity check <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Annex E (informative) \nBushing tap ratio measurement <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Annex F (informative) \nNoise identification <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Annex G (informative) \nPD pattern recognition <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Annex H (informative) \nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors<\/b><\/p>\n |