WRC volume 56 No. 03-04:2001
$27.95
Progress Reports Volume 56 No. 03-04
Published By | Publication Date | Number of Pages |
WRC | 2001 | 80 |
Contents
– PVRC Committee on Elevated Temperature (ETD), January 30, 2001
– PVRC Subcommittee on Shell Intersections (PNV-SI), January 29, 2001
– PVRC Committee on Piping Nozzles and Vessels (PNV), January 29, 2001
– Att A: Development of a Pressure Vessel Design Criteria for Internal Detonation (Blast) Loading
– PVRC Subcommittee on Flange Parameter Studies (BFC-FPS), October 16, 2000
– Project [99-06] ""Effects of Long-Term Service on Microstructure and Properties of Alloy 800H Chemical Processing Vessel"" R.W. Sindeman, P.J. Maziasz, S.Y. Zamrik
– PVRC Roster