WRC volume 40 No. 07-08:1985
$27.95
Progress Reports Volume 40 No. 07-08
Published By | Publication Date | Number of Pages |
WRC | 1985 | 106 |
Contents
– Executive Committee & Attachments, May 15, 1985
– Steering Committee on Piping Systems, May 13, 1985
– Technical Committee on Piping Systems, March 27, 1985
– Technical Committee on Piping Systems, May 13, 1985
– Materials Division, May 14, 1985
– Subcommittee on Pressure Vessel Steels, April 18, 1985
– Subcommittee on Nondestructive Examinmation of Pressure Components, May 15, 1985
– Design Division, May 15, 1985
– Subcommittee on Shells and Ligaments, May 14, 1985
– Subcommittee on Dynamic Analysis of Pressure Vessel Components, May 14, 1985
– Task Group on Dynamic Stress Criteria, May 14, 1985
– Subcommittee on Reinforced Openings and External Loadings, May 13, 1985
– Subcommittee on Bolted Flanged Connections, May 15, 1985
– Task Group on Gasket Testing, May 14, 1985
– Subcommittee on Elevated Temperature Design, May 15, 1985
– Task Group on International Benchmark Problems and Simplified Analysis Methods (E.T.D.), May 14, 1985
– Task Group on Recommended Practices (E.T.D.), May 14, 1985
– Task Group on Failure Mechanisms of the Subcommittee on Elevated Temperature Design, May 14, 1985
– Subcommittee on Piping, Pumps and Valves, May 15, 1985
– Fabrication Division, May 5, 1985
– Subcommittee on Thermal and Mechanical Effects, April 18, 1985
– Subcommittee on Weld Metals and Welding Procedures, May 1, 1985
– Subcommittee on Cyclic and Creep Behavior of Components, May 13, 1985
– PVRC Future Meeting Dates