WRC volume 39 No. 12:1984
$27.95
Progress Reports Volume 39 No. 12
Published By | Publication Date | Number of Pages |
WRC | 1984 | 102 |
Contents
– Joint PVRC Executive and Main Committe Meeting, October 18, 1984
– Technical Committee on Piping Systems, September 18, 1984
– Materials Division, October 17, 1984
– Subcommittee on Nondestructive Examination of Pressure Components, Octiber 16, 1984
– Subcommittee on Hydrogen Effects, October 17, 1984
– Subcommittee on Pressure Vessel Steels, October 15, 1984
– Subcommittee on Failure Modes in Pressure Vessel Materials, October 16, 1984
– Design Division, October 18, 1984
– Subcommittee on Reinforced Openings and External Loadings, October 15, 1984
– Subcommittee on Elevated Tempreature Design, October 17, 1984
– Subcommittee on Piping, Pumps and Valves, October 17, 1984
– Subcommittee on Shells & Ligaments, October 16, 1984
– Subcommittee on Dynamic Analysis of Pressure Vessel Components, October 16, 1984
– Subcommittee on Bolted Flanged Connections, October 17, 1984
– Task Group on Gasket Testing, October 16, 1984
– Fabrication Division, October 17, 1984
– Subcommittee on Significance of Weld Discontinuities, October 16, 1984
– Subcommittee on Weld Metals and Welding Procedures, October 16, 1984
– Subcommittee on Thermal and Mechanical Effects, April 17, 1984
– Subcommittee on Thermal and Mehcanical Effects, October 16, 1984