IEEE C57.13.5-2019
$59.58
IEEE Standard for Performance and Test Requirements for Instrument Transformers of a Nominal System Voltage of 115 kV and Above
Published By | Publication Date | Number of Pages |
IEEE | 2019 |
Revision Standard – Active. Single-phase instrument transformers of a nominal system voltage of 115 kV and above with capacitive insulation system for line-to-ground connection and for both indoor and outdoor application are discussed in this standard. This standard is intended for use as a supplement to IEEE Std C57.13-2016 and as a basis for performance and safety of equipment. Test sequences, criteria, methods, and documentation for the test are also described.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std C57.13.5ā¢-2019 Front cover |
2 | Title page |
4 | Important Notices and Disclaimers Concerning IEEE Standards Documents |
7 | Participants |
9 | Introduction |
10 | Contents |
12 | 1.āOverview 1.1āScope 1.2āPurpose 1.3āWord usage |
13 | 2.āNormative references 3.āDefinitions |
15 | 4.āGeneral 4.1āInsulation requirements |
19 | 4.2āMineral oil requirements 4.3āRequirements for accuracy and accuracy calibration systems 4.4āMechanical performance requirements |
21 | 4.5āThermal performance requirements 4.6āGround shield requirements 4.7āDissolved gas and water content requirements for new oil-immersed transformers |
22 | 4.8āEndurance capability for fast high voltage transient 4.9āPerformance of internal arc protection 4.10āIdentification of test sample in the type test report 4.11āSecondary short-circuit capability for voltage transformers |
23 | 4.12āRelaying current transformers having an anti-remanence gap 4.13āGas filling pressure and gas monitoring for gas-filled instrument transformers 5.āTest conditions |
24 | 6.āClassification of tests 6.1āRoutine tests and test sequences |
27 | 6.2āType tests and test sequences |
30 | 6.3āSpecial tests 7.āRoutine test procedures (applicable to instrument transformers) 7.1āVerification of terminal markings and polarity 7.2āCapacitance and dissipation factor test 7.3āApplied voltage test on secondary windings |
31 | 7.4āInsulation resistance test on windings 7.5āLightning impulse voltage test on the primary winding |
32 | 7.6āPower frequency voltage withstand test 7.7āPartial discharge test |
33 | 7.8āDissolved gas and water content analysis for oil-immersed transformers (of a nominal system voltage of 345 kV and above) 7.9āSealing test 7.10āGround shield check |
34 | 7.11āTests on the mineral oil 7.12āInspection and routine pressure test for enclosure of gas-filled instrument transformers 8.āRoutine test procedures (applicable to current transformers) 8.1āInter-turn over-voltage test |
35 | 8.2āAccuracy test for the metering rated current transformers 8.3āResistance measurement of relaying rated secondary windings |
36 | 8.4āPerformance characteristics of relaying current transformers |
37 | 9.āRoutine test procedures (applicable to voltage transformers) 9.1āApplied voltage test on the neutral terminal 9.2āAccuracy test 9.3āExcitation characteristics with respect to rated voltage factor |
38 | 9.4āResistance measurement of windings 10.āType test procedures (applicable to instrument transformers) 10.1āDissolved gas and water content analysis 10.2āMechanical test |
39 | 10.3āLightning impulse voltage test on the primary winding |
40 | 10.4āSwitching impulse voltage test on the primary winding ā wet |
41 | 10.5āExternal radio influence voltage (RIV) test 10.6āPower frequency voltage withstand test ā wet 10.7āPower frequency voltage withstand/partial discharge test – dry |
42 | 10.8āTemperature rise test |
44 | 10.9āShort-time mechanical and thermal rating test |
45 | 10.10āAccuracy performance test 10.11āCreepage distance measurement |
46 | 10.12āLeakage test at low temperature for gas-filled instrument transformers 10.13āBurst test on enclosure for gas-filled instrument transformers 11.āType test procedure (applicable to current transformers) 11.1āSecondary open-circuit voltage withstand test |
47 | 12.āSpecial test procedures 12.1āEndurance chopped wave test |
48 | 12.2āInternal arc test |
49 | 12.3āSeismic qualification 13.āIdentification of test sample in the type test report |
50 | 13.1āDocument package related to transformer type |
51 | AnnexĀ A (normative) Test code A.1āTemperature rise test |
52 | A.2āLeakage test at low temperature for gas-filled instrument transformers |
53 | A.3āEndurance chopped wave test |
55 | AnnexĀ B (normative) Validity of type test reports and guidance for reviewing the design comparison report for the modified design B.1āValidity of type test reports B.2āGuidance of reviewing the comparison report |
57 | AnnexĀ C (normative) Current transformers used for the detection of unbalance current of capacitor banks C.1āGeneral C.2āDefinition C.3āGeneral requirements |
63 | C.4āSpecific requirements |
68 | AnnexĀ D (normative) Gas tightness D.1āSpecification D.2āTesting D.3āCumulative test method and calibration procedure |
72 | D.4āTime between replenishments |
73 | AnnexĀ E (informative) Dielectric tests performed at an altitude of 1000 m or less for instrument transformers designed for installation at altitudes greater than 1000 m |
74 | AnnexĀ F (informative) Dielectric tests, oil sampling, and other related measurements in the field |
75 | AnnexĀ G (informative) Internal arc protection for instrument transformers |
76 | AnnexĀ H (informative) Rated voltage factor |
77 | AnnexĀ I (informative) Current transformers having transient performance requirements |
78 | AnnexĀ J (informative) Electrical endurance test, explanatory note |
79 | AnnexĀ K (informative) Bibliography |
81 | Back cover |