Shopping Cart

No products in the cart.

IEEE C37.09-2018

$91.54

IEEE Standard Test Procedures for AC High-Voltage Circuit Breakers with Rated Maximum Voltage Above 1000 V

Published By Publication Date Number of Pages
IEEE 2018 119
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Revision Standard – Active. The testing procedures for all high-voltage circuit breakers that include voltage ratings above 1000 V ac and comprise both indoor and outdoor types having the preferred ratings as listed in IEEE Std C37.04(TM) are covered. Typical circuit breakers covered by these standards have maximum voltage ratings from 4.76 kV through 800 kV, and continuous current ratings of 600 A through 5000 A associated with the various maximum voltage ratings. The test procedures verify all assigned ratings, including continuous current, dielectric withstand voltages, short-circuit current, transient recovery voltage, and capacitor switching, plus associated capabilities such as mechanical endurance, load current, and out-of-phase switching. Production test procedures are also included. This standard does not cover generator circuit breakers as these are covered in IEC/IEEE 62271-37-013. (Note: IEEE Std C37.09-2018 requires the use of a color monitor (and color printer) to view many of the graphics contained in this standard. Color is essential to the understanding of the graphics.)

PDF Catalog

PDF Pages PDF Title
1 IEEE Std C37.09™-2018 Front cover
2 Title page
4 Important Notices and Disclaimers Concerning IEEE Standards Documents
7 Participants
9 Introduction
Acknowledgments
10 Contents
12 1. Scope
2. Normative references
13 3. Definitions
14 4. Design tests
4.1 General
4.2 Maximum voltage tests
4.3 Power frequency tests
15 4.4 Continuous current-carrying tests
17 4.5 Dielectric withstand tests
22 4.6 Standard operating duty (standard duty cycle) tests
4.7 Interrupting time tests
23 4.8 Short-circuit current making and breaking tests
58 4.9 Load current switching tests
59 4.10 Capacitance current switching tests
76 4.11 Inductive load switching
4.12 Out-of-phase switching current tests
80 4.13 Mechanical endurance and environmental tests
88 4.14 Alternative operating mechanism
4.15 Control voltage
4.16 Fluid operating pressure
4.17 Design tests on pressurized components
89 4.18 Sealed pressure systems tightness tests
90 4.19 Partial discharge tests
4.20 Radio interference voltage (RIV) tests
91 4.21 Noise (sound) level tests
4.22 Instrument current transformer tests
4.23 Seismic qualification
92 5. Production tests
5.1 Types of tests
5.2 Current and linear coupler transformer tests
93 5.3 High-voltage circuit breaker bushings tests
5.4 Gas system pressure tests
94 5.5 Nameplate check
5.6 Insulating gas tightness tests
5.7 Vacuum integrity tests
5.8 Resistors, heaters, and coils check tests
95 5.9 Control and secondary wiring check tests
5.10 Clearance and mechanical adjustment check tests
5.11 Mechanical operation tests
96 5.12 Timing tests
5.13 Stored energy system tests
97 5.14 Electrical resistance of current path test
5.15 Power-frequency withstand voltage tests on major insulation components
5.16 Power-frequency withstand voltage tests on control and secondary wiring
6. Conformance tests
6.1 General
6.2 Method of conducting conformance tests for lighting impulse withstand voltage
6.3 Method of conducting conformance tests for switching impulse withstand voltage
98 7. Field tests
99 Annex A (normative) Records and reports of type tests for making, breaking, and short-time current performance
A.1 Information and results to be recorded
A.2 Information to be included in the reports
103 Annex B (informative) Explanatory notes regarding capacitance current switching
B.1 General
B.2 Explanatory note on NSDDs (4.10.11.4)
B.3 Explanatory note regarding capacitance current switching tests (4.10.2)
104 B.4 Referring to 4.10.3
B.5 Referring to 4.10.9.1.1 to 4.10.9.1.6
B.6 Referring to 4.10.9.1.1 to 4.10.9.1.6 and 4.10.9.2.1 to 4.10.9.2.6
B.7 Referring to 4.10.9.1.7 and 4.10.9.1.8
105 B.8 Referring to 4.10.9.1.7 to 4.10.9.1.10
B.9 Referring to 4.10.9.1.9 and 4.10.9.1.10
B.10 Referring to 4.10.9.2
B.11 Referring to 4.10.10 and Table 8
107 Annex C (informative) Revised test procedure for T100a
C.1 General
C.2 Basis for the new test procedure T100a
111 Annex D (normative) Standard methods for determining the values of a sinusoidal current wave and a power-frequency recovery voltage
D.1 Currents
115 D.2 Power-frequency recovery voltage
117 Annex E (informative) Bibliography
IEEE C37.09-2018
$91.54