Shopping Cart

No products in the cart.

IEEE 1534 2002

$65.54

IEEE Recommended Practice for Specifying Thyristor-Controlled Series Capacitors

Published By Publication Date Number of Pages
IEEE 2002 89
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. Weā€™re here to assist you 24/7.
Email:[email protected]

New IEEE Standard – Inactive – Withdrawn. Recommended practices for specifying Thyristor-Controlled Series Capacitor (TCSC) installations used in series with transmission lines are provided. Ratings for TCSC thyristor valve assemblies, capacitors, and reactors as well as TCSC control characteristics, protective features, cooling systems, testing, commissioning, training, documentation, operation, and maintenance are addressed.

PDF Catalog

PDF Pages PDF Title
1 Cover
2 IEEE Recommended Practice for Specifying Thyristor-Controlled Series Capacitors
4 Introduction
Participants
6 Contents
10 1. Overview
1.1 Scope
1.2 Purpose
2. References
11 3. Definitions, special symbols, acronyms, and abbreviations
3.1 Definitions
13 3.2 Special symbols
14 3.3 Acronyms and abbreviations
15 4. Service conditions
5. Operating and rating considerations
5.1 Introduction
18 5.2 TCSC characteristics
19 5.3 Basis for TCSC ratings
22 5.4 Duty cycle
25 5.5 Operational objectives
27 6. Thyristor valves (bidirectional)
6.1 Current and voltage capability
32 6.2 Valve control
35 6.3 Valve cooling system
6.4 Mechanical design
36 6.5 Valve testing
39 7. Capacitors and reactors
7.1 General
7.2 Capacitor considerations
7.3 Reactor considerations
40 8. Control and protection
8.1 Control
43 8.2 Protection
44 8.3 Monitoring and recording
47 8.4 Signal transmission and platform power
48 8.5 General requirements
49 8.6 Coordination with line protection
9. Layout
9.1 General
50 9.2 Substation yard
9.3 Platform assemblies
9.4 Control building
51 10. Safety
10.1 Personnel protection
10.2 Discharge devices
10.3 Grounding provisions
10.4 Handling and disposal
11. Testing and commissioning
11.1 Introduction
52 11.2 Design and production tests and factory control system tests
53 11.3 On-site tests
55 12. Losses and loss evaluation
12.1 Introduction
12.2 Ambient conditions
56 12.3 Calculation of losses
57 13. Reliability, availability, and maintainability
13.1 Introduction
13.2 Definitions
58 13.3 RAM analysis
13.4 Spare parts
59 13.5 Availability and reliability
14. Project scope
14.1 Introduction
14.2 New TCSC installations
61 14.3 Retrofit to an existing fixed series capacitor installation
62 15. Training
15.1 General
15.2 Off-site training
63 15.3 On-site training
15.4 Training during commissioning
16. Documentation
16.1 Introduction
16.2 Purchaser documentation
64 16.3 Supplier documentation
66 Annex A
A.1 Bibliography
68 A.2 Annotated bibliography
74 Annex B
B.1 Application studies
77 B.2 TCSC computer models (Angquist et al. [B2]; Larsen et al. [B18])
82 B.3 Legend
83 Annex C
C.1 General
C.2 AC transmission system
84 C.3 TCSC
87 C.4 Thyristor valves
88 C.5 Capacitors and reactors
C.6 TCSC control and protection
C.7 Layout
C.8 Safety
C.9 Testing and commissioning
C.10 Losses and loss evaluation
C.11 Reliability, availability, and maintainability
89 C.12 Training
C.13 Documentation
IEEE 1534 2002
$65.54