IEEE 15288.2-2014
$113.21
IEEE Standard for Technical Reviews and Audits on Defense Programs
Published By | Publication Date | Number of Pages |
IEEE | 2014 |
New IEEE Standard – Active. The requirements for technical reviews and audits to be performed throughout the acquisition life cycle for the US Department of Defense (DoD) and other defense agencies are established in this standard. This standard provides the definition, description, and intent, as well as the entry/exit/success criteria, for each technical review and audit. It is to be used to establish agreement between acquirers and suppliers on the technical reviews and audits that are needed for the project, as well as the focus and expectations of each.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std 15288.2-2014 Front Cover |
3 | Title page |
5 | Important Notices and Disclaimers Concerning IEEE Standards Documents |
8 | Participants |
10 | Introduction |
11 | Contents |
13 | Important Notice 1. Overview 1.1 Scope 1.2 Purpose |
14 | 1.3 Field of application 1.4 Organization of this standard |
15 | 1.5 Conformance 1.5.1 General 1.5.2 Full conformance 1.5.3 Tailored conformance |
16 | 2. Normative references 3. Definitions, acronyms, and abbreviations 3.1 Definitions |
17 | 3.2 Acronyms and abbreviations |
21 | 4. Overview of technical reviews and audits 4.1 Technical reviews and audits defined 4.2 The role of technical reviews and audits in the US DoD acquisition life cycle 4.3 Technical reviews and audits in the context of Technical Management processes |
22 | 4.4 Key participants for technical reviews and audits 4.4.1 General 4.4.2 Program manager 4.4.3 Systems engineer 4.4.4 Review or audit chair 4.4.5 Recorder |
23 | 4.4.6 Supplier 4.4.7 Program test lead 4.4.8 Program technical leads 4.5 Program considerations for technical reviews and audits 4.5.1 Requirements for technical reviews and audits 4.5.2 Technical reviews and audits across the program life cycle |
24 | 4.5.3 Application of technical reviews and audits 4.5.4 Multiple instances of technical reviews and audits |
25 | 4.5.5 Event-driven technical reviews and audits 4.5.6 Systems engineering technical review team 4.5.7 Technical review or audit desired outcomes |
26 | 4.5.8 Elimination or combination of technical reviews and audits 4.5.9 Technical review and audit risk assessment checklists 4.5.10 Technical review and audit action items |
27 | 4.5.11 Technical review and audit approval 4.5.12 Technical review and audit planning/conduct/reporting 4.5.12.1 General 4.5.12.2 Technical review and audit planning |
28 | 4.5.12.3 Technical review and audit conduct 4.5.12.4 Technical review and audit reporting 4.5.13 Technical reviews and audits in acquirer-supplier agreements |
29 | 4.6 Media selection for products discussed in this standard 5. Requirements for technical reviews and audits 5.1 General 5.1.1 Clause 5 tailoring 5.1.1.1 Tailoring for a claim of full conformance |
30 | 5.1.1.2 Tailoring for a claim of tailored conformance 5.1.2 Accompanying detailed criteria 5.1.3 Detailed criteria tailoring 5.1.4 Detailed criteria normative content 5.1.5 Detailed tailoring based on program type 5.1.6 Clause 5 content application 5.1.6.1 Multiple instances of reviews and audits |
31 | 5.1.6.2 Sequencing of multiple technical review or audit instances 5.2 Alternative systems review (ASR) 5.2.1 ASR purpose 5.2.2 ASR description 5.2.3 ASR timing 5.2.4 ASR entry criteria |
32 | 5.2.5 ASR content 5.2.5.1 Products to be reviewed at ASR 5.2.5.2 Conduct of the ASR 5.2.5.3 ASR outputs |
33 | 5.2.6 ASR exit criteria 5.3 System requirements review (SRR) 5.3.1 SRR purpose 5.3.2 SRR description |
34 | 5.3.3 SRR timing 5.3.4 SRR entry criteria 5.3.5 SRR content 5.3.5.1 Products to be reviewed at SRR |
35 | 5.3.5.2 Conduct of the SRR 5.3.5.3 SRR outputs 5.3.6 SRR exit criteria |
36 | 5.4 System functional review (SFR) 5.4.1 SFR purpose 5.4.2 SFR description 5.4.3 SFR timing 5.4.4 SFR entry criteria |
37 | 5.4.5 SFR content 5.4.5.1 Products to be reviewed at SFR 5.4.5.2 Conduct of the SFR 5.4.5.3 SFR outputs |
38 | 5.4.6 SFR exit criteria 5.5 Preliminary design review (PDR) 5.5.1 PDR purpose 5.5.2 PDR description |
39 | 5.5.3 PDR timing 5.5.4 PDR entry criteria 5.5.5 PDR content 5.5.5.1 Products to be reviewed at PDR 5.5.5.2 Conduct of the PDR |
40 | 5.5.5.3 PDR outputs 5.5.6 PDR exit criteria |
41 | 5.6 Critical design review (CDR) 5.6.1 CDR purpose 5.6.2 CDR description |
42 | 5.6.3 CDR timing 5.6.4 CDR entry criteria 5.6.5 CDR content 5.6.5.1 Products to be reviewed at CDR 5.6.5.2 Conduct of the CDR 5.6.5.3 CDR outputs |
43 | 5.6.6 CDR exit criteria |
44 | 5.7 Test readiness review (TRR) 5.7.1 TRR purpose 5.7.2 TRR description 5.7.3 TRR timing 5.7.4 TRR entry criteria |
45 | 5.7.5 TRR conduct 5.7.5.1 Products to be reviewed at TRR 5.7.5.2 Conduct of the TRR 5.7.5.3 TRR outputs |
46 | 5.7.6 TRR exit criteria 5.8 Functional configuration audit (FCA) 5.8.1 FCA purpose 5.8.2 FCA description 5.8.3 FCA timing 5.8.4 FCA entry criteria |
47 | 5.8.5 FCA content 5.8.5.1 Products to be reviewed at FCA 5.8.5.2 Conduct of the FCA 5.8.5.3 FCA outputs |
48 | 5.8.6 FCA exit criteria 5.9 System verification review (SVR) 5.9.1 SVR purpose 5.9.2 SVR description 5.9.3 SVR timing 5.9.4 SVR entry criteria |
49 | 5.9.5 SVR content 5.9.5.1 Products to be reviewed at SVR 5.9.5.2 Conduct of the SVR 5.9.5.3 SVR outputs |
50 | 5.9.6 SVR exit criteria 5.10 Production readiness review (PRR) 5.10.1 PRR purpose 5.10.2 PRR description |
51 | 5.10.3 PRR timing 5.10.4 PRR entry criteria 5.10.5 PRR content 5.10.5.1 Products to be reviewed at PRR 5.10.5.2 Conduct of the PRR 5.10.5.3 PRR outputs |
52 | 5.10.6 PRR exit criteria 5.11 Physical configuration audit (PCA) 5.11.1 PCA purpose 5.11.2 PCA description |
53 | 5.11.3 PCA timing 5.11.4 PCA entry criteria 5.11.5 PCA content 5.11.5.1 Products to be reviewed at PCA |
54 | 5.11.5.2 Conduct of the PCA 5.11.5.3 PCA outputs 5.11.6 PCA exit criteria |
55 | 6. Detailed criteria to be addressed for each technical review and audit 6.1 General 6.2 Alternative systems review (ASR) detailed criteria 6.2.1 ASR technical review products acceptability criteria |
57 | 6.2.2 ASR preparation |
58 | 6.2.3 ASR conduct |
59 | 6.2.4 ASR closure |
60 | 6.3 System requirements review (SRR) detailed criteria 6.3.1 SRR technical review products acceptability criteria |
64 | 6.3.2 SRR preparation |
65 | 6.3.3 SRR conduct |
66 | 6.3.4 SRR closure |
67 | 6.4 System functional review (SFR) detailed criteria 6.4.1 SFR technical review products acceptability criteria |
68 | 6.4.2 SFR preparation |
69 | 6.4.3 SFR conduct |
71 | 6.4.4 SFR closure |
72 | 6.5 Preliminary design review (PDR) detailed criteria 6.5.1 PDR technical review products acceptability criteria |
78 | 6.5.2 PDR preparation |
79 | 6.5.3 PDR conduct |
80 | 6.5.4 PDR closure |
81 | 6.6 Critical design review (CDR) detailed criteria 6.6.1 CDR technical review products acceptability criteria |
86 | 6.6.2 CDR preparation |
87 | 6.6.3 CDR conduct |
88 | 6.6.4 CDR closure |
89 | 6.7 Test readiness review (TRR) detailed criteria 6.7.1 TRR technical review products acceptability criteria |
91 | 6.7.2 TRR preparation |
92 | 6.7.3 TRR conduct |
94 | 6.7.4 TRR closure |
95 | 6.8 Functional configuration audit (FCA) detailed criteria 6.8.1 FCA technical review products acceptability criteria |
96 | 6.8.2 FCA preparation |
97 | 6.8.3 FCA conduct |
98 | 6.8.4 FCA closure |
99 | 6.9 System verification review (SVR) detailed criteria 6.9.1 SVR review products acceptability criteria |
101 | 6.9.2 SVR preparation |
102 | 6.9.3 SVR conduct |
103 | 6.9.4 SVR closure |
104 | 6.10 Production readiness review (PRR) detailed criteria 6.10.1 PRR technical review products acceptability criteria |
106 | 6.10.2 PRR preparation |
107 | 6.10.3 PRR conduct |
109 | 6.10.4 PRR closure |
110 | 6.11 Physical configuration audit (PCA) detailed criteria 6.11.1 PCA review products acceptability criteria |
111 | 6.11.2 PCA preparation |
112 | 6.11.3 PCA conduct |
113 | 6.11.4 PCA closure |
115 | 7. Technical review and audit application guidance for defense programs 7.1 General 7.2 Alternative systems review (ASR) application guidance |
116 | 7.3 System requirements review (SRR) application guidance |
117 | 7.4 System functional review (SFR) application guidance 7.5 Preliminary design review (PDR) application guidance |
118 | 7.6 Critical design review (CDR) application guidance |
119 | 7.7 Test readiness review (TRR) application guidance |
122 | 7.8 Functional configuration audit (FCA) application guidance |
123 | 7.9 System verification review (SVR) application guidance |
124 | 7.10 Production readiness review (PRR) application guidance |
125 | 7.11 Physical configuration audit (PCA) application guidance |
127 | Annex A (informative) Software requirements and architecture review (SAR) |
138 | Annex B (informative) Software specification review (SSR) |
147 | Annex C (informative) Integration readiness review (IRR) |
157 | Annex D (informative) Flight readiness review (FRR) |
166 | Annex E (informative) Bibliography |
168 | Back Cover |