IEEE 1017 2005
$37.38
IEEE Recommended Practice for Field Testing Electric Submersible Pump Cable
Published By | Publication Date | Number of Pages |
IEEE | 2005 | 28 |
Revision Standard – Active. Revision of IEEE Std 1017-1991 Procedures and test voltage values for acceptance and maintenance testing of electrical submersible pump (ESP) cable systems are presented. This recommended practice applies to cable systems rated 3 kV and 5 kV (phase to phase) and is intended only for this special-purpose cable. The intent is to provide uniform test procedures and guidelines for evaluation of the test results.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Front Cover |
5 | Introduction Notice to users Participants |
7 | Contents |
9 | IEEE Recommended Practice for Field Testing Electric Submersible Pump Cable 1. Overview 1.1 Scope |
10 | 1.2 Purpose 2. Normative references 3. Definitions 3.1 absorption current: Current resulting from charge absorbed into the dielectric as a result of… |
11 | 3.2 ac test: This test is performed by the manufacturer as a pass/fail test to ensure the electri… 3.3 acceptance test: This test is intended to detect damage before the initial installation of ne… 3.4 capacitance current: Current required to charge the capacitor formed by the dielectric of the… 3.5 dc test: This test is performed by the manufacturer to ensure the electrical integrity of the… 3.6 electric submersible pumps (ESPs): Equipment that refers to electric-driven, deep-well centri… |
12 | 3.7 ESP cable: Three-conductor power cable is installed in the well for the purpose of transmitti… 3.8 factory test: This test is completed by the manufacture at the 100% level. This voltage test … 3.9 field: This term or the term “in the field” may include cable not yet installed or cable that… 3.10 insulation resistance (IR): The opposition to current flow through the insulation. 3.11 insulation resistance test: By impressing a dc voltage across the insulation, a leakage curr… 3.12 leakage current (conductance): Current resulting from leakage through the cable insulating m… 3.13 maintenance test: This test is made after removing the cable from a well and is normally per… 3.14 motor lead extension cable: Three-conductor cable normally designed with a high-temperature/… 3.15 rated voltage: This term is expressed for phase-to-phase voltage of a three-phase system. 3.16 surface connection cable: Power cable connecting the ESP cable to surface equipment. Sometim… |
13 | 4. Safety 4.1 Description 4.2 Application 4.3 Procedures to secure cable and area |
14 | 5. General considerations 5.1 Environmental influences 5.2 Test equipment |
15 | 5.3 Equipment setup 5.4 Special fault-locating test equipment 5.5 Equipment maintenance |
16 | 6. DC high-pot test methods 6.1 Precautions 6.2 Procedures |
21 | 7. Evaluation of dc high-pot test results 7.1 Current-time relationship 7.2 Interpretation |
24 | 7.3 Dielectric failure 7.4 Current comparison |
25 | 8. Conductor resistivity and continuity tests 9. Mechanical integrity 10. Testing of surface feedthroughs and connections 10.1 Description |
26 | 10.2 Wellhead with feedthrough 10.3 Wellhead with connections 10.4 Test procedure |
27 | 10.5 Visual inspection 10.6 Procedure |
28 | Annex A (informative) Bibliography |