Shopping Cart

No products in the cart.

BSI PD ISO/IEC TR 29110-5-6-3:2019

$215.11

Systems and software engineering. Lifecycle profiles for Very Small Entities (VSEs) – Systems engineering: Management and engineering guide: Generic profile group: Intermediate profile

Published By Publication Date Number of Pages
BSI 2019 104
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

1.1 Fields of application

This document provides management and engineering guidance within the Intermediate profile for the Business Management, Project Management, System Definition and Realisation and Acquisition Management processes.

This document is applicable to Very Small Entities (VSEs). VSEs are enterprises, organisations, departments or projects having up to 25 people. The lifecycle processes described in the ISO/IEC 29110 series are not intended to preclude or discourage their use by organisations bigger than VSEs.

This document has been developed using the management and engineering guide from the systems engineering Basic profile. Elements were added or modified (e.g. process, task, work product, role) to support VSEs involved in the development of more than one project in parallel with more than one work team.

This guide is oriented towards the management of more than one project in parallel with more than one work team.

This document applies for the development of non-critical systems.

Using this document, a VSE can obtain benefits in the following aspects:

  • An agreed set of project requirements (technical part of contract) and expected work products are agreed by the Acquirer.

  • A disciplined management process, that provides project visibility and corrective actions of project problems and deviations, is performed.

  • A systematic System Definition and Realisation process, that satisfies Acquirer needs and helps ensure quality work products, is followed.

Once the system, developed by a VSE, has been accepted by their customers, the VSE that wants to provide after delivery services can refer to ISO/IEC TR 29110‑5‑3.

In the context of systems engineering, that is the System Definition and Realisation (SR) process, the group that is part of the VSE responsible for developing software elements that are part of the system are encouraged to use the management and engineering guide of the software engineering Intermediate profile (ISO/IEC TR 29110‑5‑1‑3).

1.2 Target audience

This document is targeted at VSEs that do not develop critical systems and have little or no experience with systems engineering (SE) process planning and implementation using ISO/IEC/IEEE 15288.

This document is also targeted to VSEs which are familiar with management and engineering guide of the systems engineering Basic profile (ISO/IEC TR 29110 5‑6‑2) for their system development projects and are involved in the development of more than one project in parallel with more than one work team.

This document is intended to be used with any processes, techniques and methods that enhance the VSE’s Stakeholder satisfaction and productivity.

PDF Catalog

PDF Pages PDF Title
2 undefined
7 Foreword
8 Introduction
11 1 Scope
1.1 Fields of application
1.2 Target audience
12 2 Normative references
3 Terms and definitions
14 4 Conventions and abbreviated terms
4.1 Naming, diagramming and definition conventions
16 4.2 Notation used to document new processes, additions and modifications to the Basic profile processes
4.3 Abbreviated terms
17 5 Systems Thinking
18 6 Overview
20 7 Business Management (BM) process
7.1 BM purpose
7.2 BM objectives
21 7.3 BM input work products
7.4 BM output work products
7.5 BM internal work products
22 7.6 BM roles involved
7.7 BM process description
7.7.1 BM diagram
23 7.7.2 BM activities
28 7.7.3 BM incorporation to the Organisational Repository
29 8 Project Management (PM) process
8.1 PM purpose
8.2 PM objectives
30 8.3 PM input work products
8.4 PM output work products
8.5 PM internal work products
31 8.6 PM roles involved
8.7 PM diagram
32 8.8 PM activities
8.8.1 General
41 8.8.2 PM incorporation to Project Repository
9 System Definition and Realisation (SR) process
9.1 SR purpose
9.2 SR objectives
42 9.3 SR input work products
9.4 SR output work products
9.5 SR internal work products
43 9.6 SR roles involved
9.7 SR diagram
9.7.1 General
44 9.7.2 SR activities
56 9.7.3 SR incorporation to the Project Repository
57 10 Acquisition Management process (AM)
10.1 AM purpose
10.2 AM objective
10.3 AM input work products
10.4 AM output work products
58 10.5 AM internal work products
10.6 AM roles involved
10.7 AM diagrams
10.7.1 General
61 10.7.2 AM incorporation to the Project Repository
11 Roles
63 12 Work product description
89 13 System tools requirements
13.1 System tools requirements overview
13.2 Project Management process
90 13.3 System Definition and Realisation process
91 Annex A (informative) Systems engineering deployment packages
93 Annex B (informative) Mapping between the objectives of this document and ISO/IEC/IEEE 15288 and ISO 9001
102 Bibliography
BSI PD ISO/IEC TR 29110-5-6-3:2019
$215.11