Shopping Cart

No products in the cart.

BSI PD CEN ISO/TS 3250:2022

$215.11

Petroleum, petrochemical and natural gas industries. Calculation and reporting production efficiency in the operating phase

Published By Publication Date Number of Pages
BSI 2022 82
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
2 undefined
4 European foreword
Endorsement notice
7 Foreword
8 Introduction
9 1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
20 3.2 Abbreviations
21 4 Application
4.1 Users of this document
22 4.2 Framework conditions
4.2.1 General
24 4.2.2 Quality assurance
4.2.3 HSE considerations
25 4.2.4 Sustainability and climate change considerations
4.3 Business category
26 4.4 Overview of PE calculation and reporting work process
27 4.5 Limitations
28 4.6 PE data exchange between operators in benchmarking
5 Performance measures
5.1 General
5.2 Production efficiency
5.2.1 PE forecasting
29 5.2.2 PE calculation and reporting
5.2.3 Initial production performance
30 5.3 PE measurement
31 5.4 PE calculation methodology
5.4.1 PE calculation formula
5.4.2 PE boundary conditions and reporting period
5.5 Injection efficiency calculation formula
32 6 Production
6.1 General
6.2 Material balance
33 6.3 Export – measured product
34 6.4 Conversion factors for oil equivalents
6.5 Injection
6.6 Disposal – general
6.7 Disposal – flaring or venting of large volumes
6.7.1 Production facilities with a gas export route (to sales)
6.7.2 Production facilities with a gas injection route only
35 6.7.3 Production facilities with no gas export route or other gas disposal routes
6.7.4 Flaring restrictions
6.8 Disposal – venting of small volumes
6.9 Fuel
6.10 Import
36 6.11 Artificial lift
7 Production potential
7.1 General
7.2 Methods for determination of production potential
7.3 Structural maximum production potential (Method A)
38 7.4 Achieved production potential (Method B)
7.5 Differences between Method A and Method B
39 7.6 Adjusting the production potential
41 7.7 Schedule delays
42 7.8 Injection potential
43 8 Production loss categories
8.1 General
8.2 Planned and unplanned events
8.3 Turnaround
44 8.4 Modification
8.5 Pre-production
8.6 Flaring and venting of gas
8.7 Injection
45 8.8 Accounting period
46 Annex A (normative) Production loss categorization
57 Annex B (informative) Performance measures for production availability
60 Annex C (normative) Taxonomy classification
61 Annex D (informative) Production loss subdivision with respect to system and equipment class
67 Annex E (informative) Examples
79 Bibliography
BSI PD CEN ISO/TS 3250:2022
$215.11