Shopping Cart

No products in the cart.

BS ISO 8528-6:2023

$215.11

Reciprocating internal combustion engine driven alternating current generating sets – Test methods

Published By Publication Date Number of Pages
BSI 2023 74
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
2 National foreword
7 Foreword
9 1 Scope
2 Normative references
10 3 Terms, definitions and abbreviations
3.1 Terms and definitions
15 3.2 Abbreviated terms
4 Other regulations and additional requirements
16 5 General test requirements
5.1 General
17 5.2 Measurement equipment accuracy
18 6 Functional test
6.1 General
6.1.1 General
6.1.2 Physical functional test
6.1.3 Functional test by simulation
6.2 General inspection
19 6.3 Measurements
6.4 Functional test report
20 7 Type test
7.1 General
7.2 Testing conditions
21 7.3 Characterisation of performance class
7.3.1 Steady state verification at constant power
22 7.3.2 Verification of power-sharing capability
7.3.3 Step load test
24 7.3.4 Start and stop time characteristics
25 7.4 Reactive power capability
7.4.1 General
7.4.2 Verification of reactive power capability
28 7.4.3 Test method for verification of reactive power capability control methods
32 7.5 Verification of grid synchronization limits
7.5.1 General
7.5.2 Testing method for verification of grid synchronisation limits
33 7.6 Test method for verification of FRT capability
7.6.1 General
7.6.2 Aim of the test
7.6.3 Documents to be provided before test
34 7.6.4 Test method
35 7.6.5 Acceptance criteria
7.7 Test method for verification of active power response to frequency variation
7.7.1 General
7.7.2 Aim of the test
36 7.7.3 Documents to be provided before test
7.7.4 Test method
37 7.7.5 Acceptance criteria
7.8 Test method for verification of generating set protections
7.8.1 General
7.8.2 Verification of generating set disconnection time from the grid
38 7.8.3 Verification of protection limits
39 8 Simulation-method-based assessment
8.1 General
40 8.2 Specification of model blocks
8.2.1 General
8.2.2 Engine and engine controller or governor block
41 8.2.3 AC generator block
8.2.4 Generating set controller block
8.2.5 Excitation controller (AVR) block
8.2.6 Exciter block
8.2.7 Protective devices block
42 8.2.8 Measurement transformer (if applicable)
8.3 Simulation for ISO performance class in standalone island operation
8.3.1 General
8.3.2 Model validation for standalone island mode
44 8.4 Simulation for generating sets used in grid connected applications
8.4.1 General
8.4.2 Requirements and methodologies for model validation
45 8.4.3 Model validation for different grid requirements
49 8.5 Assessment for generating set family
8.5.1 Methodology
8.5.2 Assessment for ISO performance class for family
8.5.3 Assessment for type test for family in grid parallel application
50 9 Acceptance test
9.1 General
9.2 Responsibility
9.3 Preparation
9.3.1 Provision of auxiliary personnel, test equipment and operating materials
51 9.3.2 Acceptance test preparation at the installation site
9.3.3 Acceptance test preparation at the manufacturer’s site or facility
9.3.4 Preliminary safety checks on generating set prior to testing
9.4 Further details
52 9.5 Extent of acceptance test
9.5.1 General
9.5.2 Checks (C)
53 9.5.3 Measurements (M)
54 9.6 Accuracy of measurement equipment and acceptance test procedure
9.6.1 Measurement equipment accuracy
9.6.2 Warm-up time
55 9.6.3 Generating set load test duration
9.6.4 Performing acceptance tests at the manufacturer’s works
9.6.5 Installation site acceptance test
56 9.7 Acceptance test report
9.7.1 General
9.7.2 General data
58 9.7.3 Additional measured data for acceptance test
59 Annex A (informative) Test method using OVRT/UVRT test equipment
66 Annex B (informative) Test method for frequency ride through requirements
71 Annex C (informative) Example load step test report
73 Bibliography
BS ISO 8528-6:2023
$215.11