Shopping Cart

No products in the cart.

BS ISO 4272:2022

$198.66

Intelligent transport systems. Truck platooning systems (TPS). Functional and operational requirements

Published By Publication Date Number of Pages
BSI 2022 54
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
2 National foreword
7 Foreword
8 Introduction
11 1 Scope
2 Normative references
3 Terms and definitions
14 4 Symbols and abbreviated terms
4.1 Abbreviated terms
5 Types of truck platooning systems
5.1 Top-down-managed platooning
5.1.1 LV-managed platooning
15 5.1.2 BO- and LV-managed platooning
5.2 Peer-to-peer platooning
6 Types of truck platoon formation
6.1 Overview
6.2 Formation on the motorway
6.2.1 General
6.2.2 Ad-hoc platoon formation on the motorway
6.2.3 Planned platoon formation on the motorway
16 6.3 Formation at the staging area
6.3.1 Ad-hoc platoon formation at the staging area
6.3.2 Planned platoon formation at the staging area
7 Operation state diagram
7.1 General
7.2 Operation state diagram of platooning operations
17 8 Platooning operation control function (POCF)
8.1 General
8.2 Join
18 8.3 Leave
19 8.4 Operation
8.4.1 Join operation
20 8.4.2 Leave operation
8.5 Requirements
8.5.1 Join requirements
21 8.5.2 Leave requirements
9 Platooning manoeuvre control function (PMCF)
9.1 General
9.2 Longitudinal control
24 9.3 Lateral control
25 9.4 Longitudinal control operations
9.4.1 Join manoeuvre
9.4.2 Cruising operation
9.4.3 Leave manoeuvre
9.4.4 Cut-in operation
26 9.4.5 Cut-out operation
9.5 Lateral control operations
9.5.1 Cruising (in-lane) operation
9.5.2 Lane change operation
27 9.6 Longitudinal control requirements
9.6.1 Join manoeuvre requirements
9.6.2 Cruising requirements
9.6.3 Leave manoeuvre requirements
28 9.6.4 Cut-in requirements
9.6.5 Cut-out requirements
9.7 Lateral control requirements
9.7.1 Cruising requirements
9.7.2 Lane change requirements
29 10 Communication data (V2V/V2I)
10.1 General
10.2 Requirements of communication
10.3 Communication data
10.3.1 General
10.3.2 Communication data for PMM
32 10.3.3 Communication data for PCM
33 11 Functional evaluation test method
11.1 Evaluation test conditions
11.2 Evaluation test method
11.2.1 General
11.2.2 Join evaluation test
35 11.2.3 Leave evaluation test
37 11.2.4 Cruising evaluation test
38 11.2.5 Cut-in evaluation test
40 11.2.6 Cut-out evaluation test
42 Annex A (informative) Use cases of POCF
47 Annex B (informative) Use cases of PMCF
52 Bibliography
BS ISO 4272:2022
$198.66