Shopping Cart

No products in the cart.

BS ISO 13185-4:2020

$198.66

Intelligent transport systems. Vehicle interface for provisioning and support of ITS Services – Unified vehicle interface protocol (UVIP) conformance test specification

Published By Publication Date Number of Pages
BSI 2020 52
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document specifies a conformance test for a UVIP server and client system developer assessment of self-conformance of the supplier’s UVIP server and client system. The conformance test cases follow the use cases definition of ISO 13185-1 and the requirements stated in ISO 13185-2 and ISO 13185-3.

The purpose of this document is to provide information to the UVIP server and client system provider to build and test the UVIP server and client system against the conformance test cases.

PDF Catalog

PDF Pages PDF Title
2 National foreword
10 Foreword
11 Introduction
13 1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
3.2 Abbreviated terms
14 4 Conventions
5 Conformance test plan (CTP) basic principles and clustering
5.1 Basic principles for CTC definition
15 5.2 CTC structure
5.2.1 CTC — General structure
16 5.2.2 Result criteria
5.3 CTC system setup
17 5.4 CTC clustering
5.4.1 General
5.4.2 Main CTC clusters
18 6 CT cluster 1 — Requesting V-ITS-SG and vehicle identification related information
6.1 CTC_UC 1.1 — Browsing available V-ITS-SGs
6.1.1 Overview
19 6.1.2 Test purpose
6.1.3 Configuration
6.1.4 Preamble (setup state)
6.1.5 Test execution
20 6.1.6 Postamble (setup state)
6.2 CTC_UC 1.2 — Browsing supported ECUs
6.2.1 Overview
6.2.2 Test purpose
21 6.2.3 Configuration
6.2.4 Preamble (setup state)
6.2.5 Test execution
6.2.6 Postamble (setup state)
6.3 CTC_UC 1.3 — Browsing supported data Ids
6.3.1 Overview
6.3.2 Test purpose
6.3.3 Configuration
22 6.3.4 Preamble (setup state)
6.3.5 Test execution
6.3.6 Postamble (setup state)
7 CT cluster 2 — Requesting vehicle and ECU data values
7.1 CTC_UC 2.1 — Requesting data ID values for single usage
7.1.1 Overview
7.1.2 Test purpose
7.1.3 Configuration
23 7.1.4 Preamble (setup state)
7.1.5 Test execution
7.1.6 Postamble (setup state)
24 7.2 CTC_UC 2.2 — Requesting data ID values for repeated usage
7.2.1 Overview
7.2.2 Test purpose
7.2.3 Configuration
7.2.4 Preamble (setup state)
7.2.5 Test execution
25 7.2.6 Postamble (setup state)
7.3 CTC_UC 2.3 — Requesting data ID text and data type information
7.3.1 Overview
7.4 CTC_UC 2.4 — Requesting data type definitions
7.4.1 Overview
7.5 CTC_UC 2.5 — Requesting all available text and data type information
7.5.1 Overview
8 CT cluster 3 — Requesting and clearing DTCs and related data
8.1 CTC_UC 3.1 — Requesting DTCs
8.1.1 Overview
8.1.2 Test purpose
26 8.1.3 Configuration
8.1.4 Preamble (setup state)
8.1.5 Test execution
8.1.6 Postamble (setup state)
8.2 CTC_UC 3.2 — Requesting additional DTC data
8.2.1 Overview
8.2.2 Test purpose
27 8.2.3 Configuration
8.2.4 Preamble (setup state)
8.2.5 Test execution
8.2.6 Postamble (setup state)
8.3 CTC_UC 3.3 — Clearing DTCs
8.3.1 Overview
28 8.3.2 Test purpose
8.3.3 Configuration
8.3.4 Preamble (setup state)
8.3.5 Test execution
29 8.3.6 Postamble (setup state)
8.4 CTC_UC 3.4 — SendOnChange — Provide DTC and status
8.4.1 Overview
9 CT cluster 4 — Unsolicited V-ITS-SG messages
9.1 CTC_UC 4.1 — SendOnEvent — Emergency situation
9.1.1 Overview
9.2 CTC_UC 4.2 — SendOnEvent — Critical driving situation
9.2.1 Overview
9.3 CTC_UC 4.3 — SendOnEvent — Safety situation
9.3.1 Overview
9.4 CTC_UC 4.4 — SendOnEvent — Warning situation
9.4.1 Overview
30 9.5 CTC_UC 4.5 — SendOnEvent — Data ID value matches threshold
9.5.1 Overview
10 CT cluster 5 — Real-time data transmission
10.1 CTC_UC 5.1 — Real-time data ID value measurement
10.1.1 Overview
10.2 CTC_UC 5.2 — Real-time DTC reporting
10.2.1 Overview
11 CT cluster 6 — Controlling /adjusting various equipment of the vehicle
11.1 CTC_UC 6.1 — Learn settings of customer profile
11.1.1 Overview
31 11.1.2 Test purpose
11.1.3 Configuration
11.1.4 Preamble (setup state)
11.1.5 Test execution
32 11.1.6 Postamble (setup state)
11.2 CTC_UC 6.2 — Control convenience system
11.2.1 Overview
11.2.2 Test purpose
11.2.3 Configuration
11.2.4 Preamble (setup state)
11.2.5 Test execution
33 11.2.6 Postamble (setup state)
11.3 CTC_UC 6.3 — Control charging for EV
11.3.1 Overview
11.3.2 Test purpose
11.3.3 Configuration
11.3.4 Preamble (setup state)
34 11.3.5 Test execution
11.3.6 Postamble (setup state)
12 CT cluster 7 — Writing short- and long-term data to V-ITS-SG
12.1 CTC_UC 7.1 — Write data to V-ITS-SG’s memory
12.1.1 Overview
12.1.2 Test purpose
35 12.1.3 Configuration
12.1.4 Preamble (setup state)
12.1.5 Test execution
12.1.6 Postamble (setup state)
12.2 CTC_UC 7.2 — Write vehicle profile to V-ITS-SG’s memory
12.2.1 Overview
36 12.3 CTC_UC 7.3 — Enable/disable functional system related data IDs
12.3.1 Overview
12.4 CTC_UC 7.4 — Write data ID thresholds to V-ITS-SG’s memory
12.4.1 Overview
13 CT cluster 8 — V-ITS-SG accessibility restrictions and firewall protection cluster
13.1 CTC_UC 8.1 — Secure access to V-ITS-SG
13.1.1 Overview
13.1.2 Test purpose
13.1.3 Configuration
13.1.4 Preamble (setup state)
13.1.5 Test execution
37 13.1.6 Postamble (setup state)
13.2 CTC_UC 8.2 — Request V-ITS-SG firewall status
13.2.1 Overview
13.3 CTC_UC 8.3 — Configuration of V-ITS-SG firewall
13.3.1 Overview
13.3.2 Test purpose
13.3.3 Configuration
38 13.3.4 Preamble (setup state)
13.3.5 Test execution
13.3.6 Postamble (setup state)
14 CT cluster 9 — V-ITS-SG special features
14.1 CTC_UC 9.1 — General data exchange
14.1.1 Overview
39 14.2 CTC_UC 9.2 — V-ITS-SG activation mode
14.2.1 Overview
14.3 CTC_UC 9.3 — Upload EventLogFile from V-ITS-SG
14.3.1 Overview
14.3.2 Test purpose
14.3.3 Configuration
14.3.4 Preamble (setup state)
14.3.5 Test execution
40 14.3.6 Postamble (setup state)
15 CT cluster 10 — Vehicle diagnostics
15.1 CTC_UC 10.1 — Perform functional group OBD
15.1.1 Overview
15.1.2 Test purpose
15.1.3 Configuration
15.1.4 Preamble (setup state)
15.1.5 Test execution
41 15.1.6 Postamble (setup state)
15.2 CTC_UC 10.2 — Perform enhanced OBD
15.2.1 Overview
15.2.2 Test purpose
15.2.3 Configuration
15.2.4 Preamble (setup state)
42 15.2.5 Test execution
15.2.6 Postamble (setup state)
15.3 CTC_UC 10.3 — Upload VSOCLogFile from V-ITS-SG
15.3.1 Overview
15.3.2 Test purpose
15.3.3 Configuration
15.3.4 Preamble (setup state)
43 15.3.5 Test execution
15.3.6 Postamble (setup state)
16 CT cluster 11 — Electric vehicle system status
16.1 CTC_UC 11.1 — Monitor battery charge status
16.1.1 Overview
16.1.2 Test purpose
16.1.3 Configuration
44 16.1.4 Preamble (setup state)
16.1.5 Test execution
16.1.6 Postamble (setup state)
16.2 CTC_UC 11.2 — Monitor connection between charging station and EV
16.2.1 Overview
16.2.2 Test purpose
45 16.2.3 Configuration
16.2.4 Preamble (setup state)
16.2.5 Test execution
16.2.6 Postamble (setup state)
16.3 CTC_UC 11.3 — Battery charge start/stop notification
16.3.1 Overview
46 17 CT cluster 12 — V-ITS-SG maintenance
17.1 CTC_UC 12.1 — Update core software of V-ITS-SG
17.1.1 Overview
17.1.2 Test purpose
17.1.3 Configuration
17.1.4 Preamble (setup state)
17.1.5 Test execution
47 17.1.6 Postamble (setup state)
17.2 CTC_UC 12.2 — Perform a Reset in V-ITS-SG
17.2.1 Overview
17.2.2 Test purpose
17.2.3 Configuration
17.2.4 Preamble (setup state)
17.2.5 Test execution
17.2.6 Postamble (setup state)
48 17.3 CTC_UC 12.3 — Perform a reset in V-ITS-SG
17.3.1 Overview
17.3.2 Test purpose
17.3.3 Configuration
17.3.4 Preamble (setup state)
17.3.5 Test execution
17.3.6 Postamble (setup state)
17.4 CTC_UC 12.4 — Upload V-ITS-SG configuration file
17.4.1 Overview
49 17.4.2 Test purpose
17.4.3 Configuration
17.4.4 Preamble (setup state)
17.4.5 Test execution
17.4.6 Postamble (setup state)
17.5 CTC_UC 12.5 — Download V-ITS-SG configuration file
17.5.1 Overview
50 17.5.2 Test purpose
17.5.3 Configuration
17.5.4 Preamble (setup state)
17.5.5 Test execution
17.5.6 Postamble (setup state)
51 Bibliography
BS ISO 13185-4:2020
$198.66