Characterization of waste. Framework for the preparation and application of a testing programme. Objectives, planning and report

Published By Publication Date Number of Pages
BSI 2014 30
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This European Standard specifies requirements for a waste testing programme regarding mainly objectives, planning and report with the intent to ensure reliable and comparable results when using the reference methods that have been developed and/or adopted by CEN/TC 292.

The planning and report aspects of this European Standard are applicable to any waste testing programme dedicated to the determination of one or several parameters. They are also applicable to all testing steps for each parameter from sampling up to reporting whether these steps are taking place in the field (e.g. sampling) or in the laboratory (e.g. analysis-quantification).

This European Standard does not address aspects of safety for activities in the field and inside laboratory.

NOTE The term planning a testing programme is used here with the general meaning of organizing a testing programme and being in accordance with the terms testing plan, sampling plan, laboratory plan used in the present European Standard.

PDF Catalog

PDF Pages PDF Title
3 CEN/TC 292
Secretariat: NEN
4 Contents Page
5 Foreword
6 Introduction
7 1 Scope
2 Normative references
9 3 Terms and definitions
11 4 Defining a waste testing programme
4.1 Principles
12 4.2 Structure of a waste testing programme
4.2.1 First actions and overview of a waste testing programme
Figure 1 — Overview of a waste testing programme
13 4.2.2 The seven testing steps of a waste testing programme
14 Figure 2 — Illustration of the testing steps in a waste testing programme addressing a single parameter to be tested (informative)
4.3 Parameters to be tested for a waste
15 Figure 3 — Illustration of the testing steps in a usual waste testing programme addressing several parameters to be tested (informative)
4.4 Responsibilities and programme manager
16 Table 1 — Responsibilities of the programme manager and of the different works
4.5 Standards to be used
17 5 Carrying out a waste testing programme
6 Overall testing report
19 Annex A (normative) Matrix testing steps versus parameters specifying the standards to be used in a waste testing programme
20 Table A.1
27 Annex B (informative) A-deviations
28 Bibliography