ASME BPVC III 3 2001
$377.00
ASME BPVC – III – 3 -2001 BPVC Section III, Rules for Construction of Nuclear Facility Components, Divison 3, Containment Systems & Transport Packagings for Spent Nuclear Fuel & High Level Radioactive Waste
Published By | Publication Date | Number of Pages |
ASME | 2001 | 224 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
7 | Foreword |
11 | Statements of Policy |
13 | Personnel |
23 | Organization of Section III |
25 | Summary of Changes |
31 | Subsection WA General Requirements |
32 | WA-1000 Scope of Division 3 |
35 | WA-2000 Design Basis for Containment Transport and Storage |
39 | WA-3000 Responsibilities and Duties |
57 | WA-4000 Quality Assurance |
62 | WA-5000 Authorized Inspection |
67 | WA-8000 Certificates of Authorization, Nameplates, Code Symbol Stamping, and Data Reports |
79 | WA-9000 Glossary |
84 | Subsection WB Class TP (Type B) Containment |
85 | WB-1000 Introduction |
87 | WB-2000 Material |
124 | WB-3000 Design |
149 | WB-4000 Fabrication and Installation |
199 | WB-5000 Examination |
210 | WB-6000 Testing |
217 | WB-8000 Nameplates, Stamping, and Reports |
219 | Reference Material |
222 | SI Units |