AISC A207 2020
$22.10
AISC 207-20 Standard for Certification Programs
Published By | Publication Date | Number of Pages |
AISC | 2020 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Standard for Certification Programs |
3 | Title Page |
4 | Copyright Preface |
7 | Table of Contents |
13 | Glossary |
19 | Chapter 1 General Requirements 1.1 Purpose 1.2 Scope 1.3 References |
20 | 1.4 Definitions 1.5 Management Responsibility |
23 | 1.6 Construction Document Review and Communication |
24 | 1.7 Detailing |
27 | 1.8 Control of Management System Documents and Project Documents |
29 | 1.9 Maintenance of Quality Records |
30 | 1.10 Purchasing |
31 | 1.11 Material Identification |
32 | 1.12 Process Controls |
33 | 1.13 Inspection and Testing |
35 | 1.14 Calibration of Inspection, Measuring, and Test Equipment |
36 | 1.15 Control of Nonconformances |
37 | 1.16 Corrective Action |
38 | 1.17 Handling, Storage, and Delivery of Materials, Fabricated Work, and Components 1.18 Training 1.19 Internal Audit |
39 | Chapter 2 Building Fabricator Requirements 2.3 References 2.5 Management Responsibility |
41 | Chapter 3 Metal Component Manufacturer Requirements 3.3 References 3.5 Management Responsibility |
42 | 3.7 Detailing |
43 | Chapter 4 Bridge Fabricator Requirements 4.2 Scope |
44 | 4.3 References 4.5 Management Responsibility |
45 | 4.7 Detailing |
46 | 4.11 Material Identification 4.12 Process Controls |
47 | Chapter 4.I Supplemental Requirements for Fabricators of Intermediate Bridges 4.I.2 Scope 4.I.5 Management Responsibility 4.I.7 Detailing |
48 | 4.I.12 Process Controls |
49 | Chapter 4.A Supplemental Requirements for Fabricators of Advanced Bridges 4.A.2 Scope 4.A.6 Construction Document Review and Communication |
50 | 4.A.12 Process Controls |
51 | Chapter 4.F Supplemental Requirements for Fabricators of Fracture-Critical Members 4.F.2 Scope 4.F.5 Management Responsibility 4.F.7 Detailing |
52 | 4.F.10 Purchasing 4.F.11 Material Identification 4.F.12 Process Controls 4.F.13 Inspection and Testing 4.F.15 Control of Nonconformances |
53 | Chapter 5 Erector Requirements 5.3 References |
54 | 5.5 Management Responsibility |
56 | 5.8 Control of Management System Documents and Project Documents 5.10 Purchasing |
57 | 5.12 Process Controls 5.16 Corrective Action 5.18 Training |
58 | 5.19 Internal Audit 5.20 Erection Plan |
59 | 5.21 Safety Plan |
60 | 5.22 Other Project-Specific Requirements |
61 | Chapter 6 Hydraulic Metal Structures Fabricator Requirements 6.2 Scope |
62 | 6.3 References 6.5 Management Responsibility |
64 | 6.6 Construction Document Review and Communication 6.7 Detailing |
65 | 6.12 Process Controls |
67 | Chapter 6.A Supplemental Requirements for Fabricators of Advanced Hydraulic Metal Structures 6.A.3 References 6.A.5 Management Responsibility 6.A.12 Process Controls |
69 | Chapter 6.F Supplemental Requirements for Fabricators of Fracture-Critical Members of Hydraulic Metal Structures 6.F.3 References 6.F.5 Management Responsibility 6.F.7 Detailing |
70 | 6.F.10 Purchasing 6.F.11 Material Identification 6.F.12 Process Controls |
71 | 6.F.13 Inspection and Testing 6.F.15 Control of Nonconformances |
72 | Inside back cover |