$40.35

334.3R-05: Construction of Concrete Shells Using Inflated Forms

Published By Publication Date Number of Pages
ACI 2005 13
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This report provides information on the construction of structural concrete shells using an inflated form. Major facets of the construction process are covered, including foundations, inflation, monitoring, and backup systems. Other aspects, such as the geometric variations of inflated forms, thickness of polyurethane foam, and mixture proportions for shotcrete, are also considered. Keywords: dome; fabric; inflation; polyurethane foam; reinforcement; shotcrete; thin shell.

PDF Catalog

PDF Pages PDF Title
1 CONTENTS
2 CHAPTER 1— GENERAL
1.1- Introduction ( Fig. 1.1)
1.2—Scope (Fig. 1.2)
1.3—History (Fig. 1.3)
3 1.4—Methods (Fig. 1.7)
1.5—Definitions
4 1.6—Preconstruction
1.7—Work schedule
CHAPTER 2— FOUNDATIONS
2.1- General
2.2—Concrete
2.3—Soil conditions
5 2.4—Reinforcement material
2.5—Placement of reinforcement
2.6—Placement of anchors
2.7—Concrete placement
6 2.8—Foundation dowels
2.9—Uplift prevention
CHAPTER 3— INFLATED FORMS
3.1- General
3.2—Inflated form material and manufacturing
3.2.1 Shape
3.2.2 Size
3.2.3 Fabric
7 3.2.3.1 Fabric stress
3.2.3.2 Allowable fabric stress
3.2.4 Fabrication
3.3—Field layout
3.4—Form protection
3.5—Initial stretching
3.6—Inflation
8 3.7—Construction tolerances
3.8—Air pressure maintenance
3.8.1 Backup air pressure systems
3.8.2 Air pressure monitoring
3.9—Collapse prevention
3.10—Miscellaneous connections
9 3.11—Fabric form repair
3.12—Polyurethane foam (when used)
3.13—Preparation
3.14—Foam application
3.15—Construction hazards
3.15.1 Wind
3.15.2 Construction loads
3.15.3 Proper venting
CHAPTER 4— SHOTCRETE DOME
4.1- General
10 4.2—Reinforcement material and size
4.2.1 Material
4.2.2 Size
4.3—Clear spacing between bars
4.4—Splices
4.5—Cover
4.6—Preliminary reinforcement mat (premat)
4.7—Shell reinforcement
4.8—Preconstruction shotcrete tests
4.9—Shotcrete compression tests
4.9.1 Sampling
4.9.2 Panel criteria
11 4.9.3 Acceptance criteria
4.10—Proportions and materials
4.10.1 Fine aggregate (sand)
4.10.2 Coarse aggregate
4.10.3 Water
4.10.4 Admixtures
4.10.5 Rebound
4.11—Field practice
4.12—Nozzle operator qualifications
4.13—Shotcrete operation
12 4.14—Discharge time
4.15—Joints
4.16—Multi-pass technique
4.17—Curing
4.18—Shotcrete placement tolerance
4.19—Shotcrete damage
13 4.20—Completion
CHAPTER 5— REFERENCES
5.1- Referenced standards and reports
5.2—Cited references