{"id":389461,"date":"2024-10-20T03:50:09","date_gmt":"2024-10-20T03:50:09","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iec-631752021\/"},"modified":"2024-10-26T07:02:28","modified_gmt":"2024-10-26T07:02:28","slug":"bs-iec-631752021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iec-631752021\/","title":{"rendered":"BS IEC 63175:2021"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | INTRODUCTION <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4 Cyclotron composition and operational conditions 4.1 Composition 4.2 Normal operating conditions 4.2.1 Environmental requirements 4.2.2 Electricity requirements 4.2.3 Compressed air 4.2.4 Nitrogen <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.2.5 Lightning and electric shock protection 4.2.6 Ion source media 5 Technical requirements 5.1 Warning signs 5.2 Performance index 5.3 Main subsystems performance index 5.3.1 Ion source 5.3.2 Radio frequency system 5.3.3 Vacuum system <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.3.4 Control system 5.3.5 Interlock system for radiation safety 5.3.6 Water cooling system <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.3.7 Stripping extraction efficiency 5.4 Electrical safety 5.4.1 Protective grounding 5.4.2 Insulation resistance 5.4.3 Dielectric strength 5.4.4 Touch current 5.5 Radiation safety 5.6 EMC 5.6.1 Surge immunity 5.6.2 EFT immunity 5.6.3 Emission <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.6.4 Immunity 5.7 Operation 6 Test methods 6.1 General requirements 6.1.1 Test environmental conditions 6.1.2 Test equipment 6.2 Warning signs check Table 1 \u2013 Environmental conditions of the test <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 6.3 Performance test 6.3.1 Beam nominal energy 6.3.2 Beam intensity 6.3.3 Beam spot size <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6.3.4 Comprehensive beam efficiency Figures Figure 1 \u2013 Schematic diagram of beam spot diameter test Figure 2 \u2013 Schematic diagram of beam spot diameter test result <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.4 Main subsystem performance test 6.4.1 Ion source beam intensity 6.4.2 Radio frequency system <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.4.3 Vacuum system 6.4.4 Control system 6.4.5 Interlock system for radiation safety <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.4.6 Water cooling system 6.4.7 Stripping extraction efficiency 6.5 Electrical safety 6.5.1 Protective grounding 6.5.2 Insulation resistance 6.5.3 Dielectric strength 6.5.4 Touch current <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.6 Radiation safety 6.7 Operation test 7 Inspection rules 7.1 Summary 7.2 Inspection items Table 2 \u2013 Inspection items of 10 MeV to less than 30 MeV cyclotron <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 7.3 Criterion rule 8 Signage, packing, transportation, storage and accompanying documents 8.1 Signage 8.1.1 Cyclotron signs 8.1.2 Labels 8.2 Packing 8.3 Transportation <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 8.4 Storage 8.5 Accompanying documentation 8.5.1 Instructions 8.5.2 Supplier\u2019s declaration of conformity 8.5.3 Other documentation <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Annex A (informative)Measurement of unloaded quality factor by the manufacturer Figure A.1 \u2013 Connection of resonant cavity and network analyzer Figure A.2 \u2013 S21 curve measured with a network analyzer <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Annex B (informative)Magnetic field mapping <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Figure B.1 \u2013 Distribution of measuring points in the cyclotron central plane <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Fixed energy high intensity proton cyclotron within the energy range of 10 MeV to less than 30 MeV<\/b><\/p>\n |