{"id":218966,"date":"2024-10-19T14:12:28","date_gmt":"2024-10-19T14:12:28","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-136702009\/"},"modified":"2024-10-25T07:29:40","modified_gmt":"2024-10-25T07:29:40","slug":"bs-en-136702009","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-136702009\/","title":{"rendered":"BS EN 13670:2009"},"content":{"rendered":"
(1) This European Standard gives common requirements for execution of concrete structures, it applies to both in-situ works and construction using prefabricated concrete elements.<\/p>\n
(2) This standard expects the execution specification to state all the specific requirements relevant to the particular structure.<\/p>\n
(3) This standard is applicable to permanent as well as temporary concrete structures.<\/p>\n
(4) Additional or different requirements should be considered and, if required, given in the execution specification when using:<\/p>\n
lightweight aggregate concrete;<\/p>\n<\/li>\n
other materials (e.g. fibres) or constituent materials;<\/p>\n<\/li>\n
special technologies\/innovative designs.<\/p>\n<\/li>\n<\/ol>\n
(5) This standard does not apply to concrete members used only as equipment or construction aids for the execution.<\/p>\n
(6) This standard does not cover the specification, production and conformity of concrete.<\/p>\n
(7) This standard is not applicable to the production of precast concrete elements made in accordance with product standards.<\/p>\n
(8) This standard does not cover safety and health aspects of execution, or third party safety requirements.<\/p>\n
(9) This standard does not cover contractual issues or responsibilities for the identified actions.<\/p>\n
It is within the concept of this standard that supplementing requirements can be given for the individual project in the execution specification, on a national level in a national annex, or on a general basis in European standards for special applications e.g. standards for special geotechnical works.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"
Execution of concrete structures<\/b><\/p>\n\n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2015<\/td>\n 76<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":218969,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1249,2641],"product_tag":[],"class_list":{"0":"post-218966","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-91-080-40","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/218966","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/218969"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=218966"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=218966"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=218966"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}